My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Verde Design, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Verde Design, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2016 4:53:00 PM
Creation date
11/22/2016 4:52:35 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Verde Design, Inc.
PROJECT NAME
Sandpiper Field and Marlin Park Synthetic Turn Renovation Project
RMP File Number
304
Date
11/15/2016
MO Ref
16-208
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
E. SPECIAL PROVISIONS <br /> Without attempting to be all-inclusive and for purposes of clarity, the following items are <br /> specifically not included in the Scope of Services: <br /> 1 . Meetings other than those listed. <br /> 2. Project design and documentation outside existing synthetic turf field limits <br /> 3. Topographic Surveying or Underground Utility Surveying <br /> 4. Environmental Impact Report documentation <br /> 5. Electrical and Structural Engineering Design <br /> 6. Permitting with public agencies other than the City <br /> 7. Architecture Design <br /> 8. Public right-of-way design work <br /> 9. Fees of any kind required for project approval. <br /> 10. Soil and / or Field sampling and Laboratory Testing services (other than initial geotechnical <br /> testing at Marlin Park as noted above) <br /> 11 . QSD /QSP Services (other than erosivity waiver or SWPPP processing for the two project <br /> areas) <br /> Services will be diligently pursued and every reasonable effort will be made to meet the mutually <br /> agreed upon schedule. If the completion of the services is delayed at any time in the progress of <br /> the work undertaken in this Agreement by conditions beyond the control of the Consultant; <br /> including but not limited to: strikes, lockouts, labor disputes, or the inability of City, his consultants, <br /> utility companies, or jurisdictional agencies to provide required information, processing or <br /> direction; the time of completion shall be extended during such period and Consultant shall be <br /> held harmless from any and all claims arising out of such delay. <br /> F. CHANGE IN SERVICES <br /> City may order changes in scope or character of service, either decreasing or increasing the <br /> amount of Consultant's services, and if necessary, changing the character of services. In the <br /> event that such changes are ordered, Consultant is entitled to full compensation for all services <br /> performed and expenses incurred prior to receipt of notice of change. <br /> In the event that additional services including, but not limited to design, plans, renderings, and <br /> presentations not included in the Scope of Services are required; or for changes and revisions <br /> requested by the City after work has been performed, they will be performed on an hourly charge <br /> rate basis as extra work in accordance with the charge rate schedule in effect at the time the <br /> services are performed. <br /> REV: 10-17-16 VR <br /> Page 13 of 15 <br /> ATTY/AGR.2016.299Nerde Design, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.