My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-08-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:50:18 PM
Creation date
8/19/2004 1:45:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. B ,2B <br />· A detailed view of the actual work to be performed around the existing <br /> meters, highlighting the areas for separation and point of connection <br />· Standard drawing details <br />· Standard notes <br />Task 5.2 - Final Construction Cost Estimate and Schedule <br />A final estimate of probable cost and a construction schedule will be prepared for each <br />Site. This cost estimate will include cost of materials, labor, and contractor overhead <br />and profit. <br />Task 5.3 - Submit Final Design Package to City <br />A final design submittal will be prepared for each Site. The submittal will contain the <br />final design package, a final estimate of probable cost and recycled water demand, a <br />final construction schedule, and a checklist for the City to use in its review of the <br />submittal. Three (3) copies of the submittal will be submitted to City staff for review and <br />approval. One copy will be returned with review comments to Consultant. <br />Task 6 - Design Package Approval Coordination <br />Task 6.1 - City Approval <br />Consultant will provide an original set of drawings to the City for signature. Once the <br />City has approved and signed the drawings, they will be returned to the Consultant to <br />be stamped and signed by a Registered Professional Engineer in the State of <br />California. Consultant will convert the fully signed drawings into digital format to be <br />posted on the Project Portal (developed under separate contract). <br />Task 6.2 - DHS Approval <br />Submit three (3) copies of stamped, signed Final Design Drawings to DHS on behalf of <br />the City. The assumption is that the City will self monitor the retrofits under the DHS <br />General Permit Guidelines and that each design package will be approved or accepted <br />with the first submittal, with possible corrections noted. Resubmittals and revisions due <br />to DHS comments are not included in this work effort or scope. Once DHS acceptance <br />or signature is obtained, the design package is considered complete and ready for <br />bidding and construction. <br />Task 7 - Bidding Services <br />The engineering labor effort for bidding services is developed for one "Group Bid" <br />package that will be comprised of customer sites selected by the City. The engineering <br />and support labor effort to execute the group 1 or subsequent group bids is estimated <br />to be 56 hours. <br />Task 7.1 - Prepare strategy and criteria for grouping sites into bid packages <br />Agreement over $10K 22 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.