My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-08-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:50:18 PM
Creation date
8/19/2004 1:45:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> 1. 6-2q <br />Consultant will establish the strategic approach and criteria for grouping individual <br />customer site designs into discreet bid packages over time, and as site designs are <br />approved. The City's Engineering and Construction division will oversee the bid and <br />award process. It is anticipated that multiple retrofit bid packages will be issued by the <br />City over the duration of the Project. <br />Task 7.2 - Prepare Contract Documents for Group 1 Bid <br />Consultant will edit and prepare City Contract Documents, bid forms, general and <br />supplemental conditions and combined these documents with each site retrofit design <br />to be included in Group 1 Bid. When project is complete and all construction <br />documents are approved and ready for bidding, consultant shall prepare and deliver to <br />the City one (1) camera ready set of contract documents and plan sets. The City will <br />provide the reproduction resources. <br />Task 7.3 - Group 1 Bid Support <br />Provide support during the Group 1 bid period including responding to contract <br />questions, preparing addenda, coordinating and attending one pre-bid meeting, and <br />evaluating the bid result. Provide to the City a recommendation for award. <br />Advertisement, bid document production and the bid opening will be provided by the <br />City. <br />Task 8 - Construction Management Services <br />Provide office engineering support and construction observation and management <br />services during the retrofit construction period. <br />Task 8.1 - Construction Engineering Support <br />Services shall include review of shop drawings and responses to requests for <br />information and clarification. Consultant shall provide design services, if needed during <br />construction for change order related work. These services may including preparation <br />of drawings, specifications, and cost estimates. It is anticipated that 108 engineering <br />labor hours will be required per Group Bid for Construction Engineering Support. <br />Task 8.2 - Construction Observation Services <br />Visit the Project sites to observe construction at critical points, discuss with Contractor <br />the correction of any defects, and make recommendations as to replacement or <br />correction of defective work. It is anticipated that construction observation will be <br />performed on a part time basis, depending upon the complexity of the retrofit and <br />customer related issues. It is anticipated that 24 construction observation labor hours <br />will be required per site. <br />Task 8.3 - Construction Management <br />Receive and review all certificates of inspections, tests and approvals. Consultant's <br />review of such certificates will be for the purpose of determining that the results certified <br />Agreement over $10K 23 <br />KennedyJenks Rev-2 112603 <br />n..._·'.... - ._. "..-. ' ..._"..._u__...._...~.".~._"_~..~.._~_·......_'___ <br />
The URL can be used to link to this page
Your browser does not support the video tag.