My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-08-23
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-08-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:50:18 PM
Creation date
8/19/2004 1:45:05 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
8/23/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />=f·ßø30 <br />indicate compliance with the Contract Documents and will constitute an independent <br />evaluation that the content or procedures of such inspections, tests or approvals <br />comply with the requirements of the Contract Documents. The independent evaluation <br />does not constitute certification of inspections, only that they conform to contract <br />documents. <br />Assist the City in coordinating and scheduling the startup and for refining and adjusting <br />the system or equipment. Upon completion of the individual site Retrofits, Consultant <br />shall advise City in writing that the Retrofit has been completed in accordance with the <br />construction contract documents and any changes thereto, in accordance with all <br />applicable codes, ordinances and regulations. Review contractor's submittals for <br />measurement and payment of work, and recommendation to the City for payment on a <br />monthly basis during construction. <br />It is anticipated that 214 labor hours will be required for Construction Management <br />Services for the Group 1 Bid. <br />Task 8.4 - Cross-Connection Testing and Conversion <br />Consultant shall provide oversight during the cross-connection tests. These tests will be <br />conducted by the contractor and performed before connecting the Customer's recycled <br />water system to the Water Utility's recycled water system at any use-site where both <br />recycled and potable water are present. It is anticipated that 3 labor hours per site will <br />be required for Cross-Connection Testing and Conversion. <br />Task 8.5 - Coordinate Final Inspections and Contract Close-out <br />Consultant will coordinate with the Program to conduct a final on-site inspection to <br />satisfy State DHS requirements. This inspection will be coordinated with the final cross- <br />connection test and will cover the following: <br /> · Check for use of proper equipment for retrofit installation <br /> · Placement of all required tags, labels and signs <br /> · Check for runoff or windblown spray outside the approved use area <br /> · Check for ponding of recycled water within the use area <br /> · Check spray patterns for encroachment on public facilities <br />It is anticipated that three labor hours will be required for final inspections and close out <br />for each site. <br />Task 9 - Customer Site Supervisor Training <br />Consultant shall assist City in conducting a formal training program for Customer Site <br />Supervisors prior to the scheduled retrofit start-up date. The training program will need <br />to fulfill the requirements of the Discharge Permit for Water Recycling and the California <br />Department of Health Services requirements. Sufficient training sessions shall be <br />Agreement over $10K 24 <br />KennedyJenks Rev-2 112603 <br />
The URL can be used to link to this page
Your browser does not support the video tag.