My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Recycled Water (S... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Recycled Water (S... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2014 2:52:28 PM
Creation date
8/24/2004 8:59:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority SBSA
PROJECT NAME
production & delivery of recycled water
RMP File Number
802
Date
8/1/2004
MO Ref
04-152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.7 Replacement/Reconstructiop <br /> If the Recycled Water Facilities located on SBSA's property and owned by SBSA <br /> (i.e., Facilities 1, 2 and 10)are damaged or destroyed, SBSA will restore or <br /> replace them as soon as reasonably practicable. If the facilities damaged or <br /> destroyed are owned by City, City will be obligated to restore or replace them as <br /> soon as reasonable practicable. However, if the restoration or replacement <br /> obligation of SBSA appears to be economically or practicably infeasible, SBSA <br /> shall so notify City and they shall meet and confer regarding a process for, and <br /> resolution of, the requirement for restoration or replacement and may, by <br /> amendment or supplement to this Agreement,provide for City's assumption of <br /> costs pertaining thereto and SBSA's corresponding construction obligation of <br /> restoration or replacement. If City conclusively determines that such restoration <br /> or replacement is economically or practicably infeasible, City may terminate this <br /> Agreement. If the repair or restoration pertains to City-owned facilities and City <br /> determines that the cost of restoration or replacement is economically or <br /> practicably infeasible, City may likewise terminate this Agreement. <br /> 6.8 Interruptions in Supply <br /> SBSA will operate the Treatment Plant and Recycled Water Facilities with the <br /> objective of providing a continuous supply of Recycled Water to City at the <br /> production rate defined in Attachment Ten and illustrated in Attachment Eight. <br /> The Parties recognize that both scheduled maintenance and unexpected <br /> emergencies may occasionally interrupt delivery of Recycled Water. City will be <br /> responsible for metering and recordkeeping of potable water introduced by City <br /> into its storage tank for use during both types of interruptions. <br /> -14- 1091374.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.