My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Recycled Water (S... (2)
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Recycled Water (S... (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2014 2:52:28 PM
Creation date
8/24/2004 8:59:37 AM
Metadata
Fields
Template:
Agreement
Contractor Name
South Bayside System Authority SBSA
PROJECT NAME
production & delivery of recycled water
RMP File Number
802
Date
8/1/2004
MO Ref
04-152
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cost-effectively deliver more Recycled Water in the future, if needed, up to an <br /> annual delivery rate of 3,238 acre feet. <br /> F. The purpose of this Agreement is to set out the understanding of SBSA and City <br /> as to their respective roles and responsibilities in the design, construction and <br /> operation of the Project. <br /> 2.0 DESIGN OF FACILITIES <br /> 2.1 Design of Facilities Located on SBSA's Property <br /> SBSA will be solely responsible for the engineering design and preparation of <br /> plans, specifications and Construction Contract Documents for those Project <br /> facilities to be located on SBSA's property and owned by SBSA. These facilities <br /> are described under Items 1, 2 and 10 in Attachment One. <br /> SBSA also will be responsible for the engineering design and preparation of <br /> plans, specifications and Construction Contract Documents for those Project <br /> facilities to be located on SBSA's property and owned by City. These are <br /> described under Items 3 through 9 and 11 in Attachment One. <br /> The engineering design for both City-owned facilities and SBSA-owned facilities <br /> shall conform to City's design criteria, as described in Attachment Two. - <br /> SBSA has heretofore undertaken various Project planning and design tasks, with <br /> City's approval, that pertain to facilities to be located on SBSA's property. Those <br /> tasks,the responsible engineering firms, and associated costs are listed on <br /> Attachment Three. <br /> City ratifies its approval of SBSA's award of the contracts and issuance of the <br /> task orders listed on Attachment Three, and agrees to reimburse SBSA for the <br /> costs heretofore incurred by it, as provided in Section 7.3.1. <br /> -3- 1091374.7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.