Laserfiche WebLink
cost-effectively deliver more Recycled Water in the future, if needed, up to an <br /> annual delivery rate of 3,238 acre feet. <br /> F. The purpose of this Agreement is to set out the understanding of SBSA and City <br /> as to their respective roles and responsibilities in the design, construction and <br /> operation of the Project. <br /> 2.0 DESIGN OF FACILITIES <br /> 2.1 Design of Facilities Located on SBSA's Property <br /> SBSA will be solely responsible for the engineering design and preparation of <br /> plans, specifications and Construction Contract Documents for those Project <br /> facilities to be located on SBSA's property and owned by SBSA. These facilities <br /> are described under Items 1, 2 and 10 in Attachment One. <br /> SBSA also will be responsible for the engineering design and preparation of <br /> plans, specifications and Construction Contract Documents for those Project <br /> facilities to be located on SBSA's property and owned by City. These are <br /> described under Items 3 through 9 and 11 in Attachment One. <br /> The engineering design for both City-owned facilities and SBSA-owned facilities <br /> shall conform to City's design criteria, as described in Attachment Two. - <br /> SBSA has heretofore undertaken various Project planning and design tasks, with <br /> City's approval, that pertain to facilities to be located on SBSA's property. Those <br /> tasks,the responsible engineering firms, and associated costs are listed on <br /> Attachment Three. <br /> City ratifies its approval of SBSA's award of the contracts and issuance of the <br /> task orders listed on Attachment Three, and agrees to reimburse SBSA for the <br /> costs heretofore incurred by it, as provided in Section 7.3.1. <br /> -3- 1091374.7 <br />