My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 TJKM
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 TJKM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:49:51 AM
Creation date
12/16/2016 12:51:19 PM
Metadata
Fields
Template:
Agreement
Contractor Name
TJKM
PROJECT NAME
Neighborhood Streeet Enhancement Program
RMP File Number
304
Date
12/16/2016
MO Ref
16-242, 18-050
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
o Facilitation of meeting to maximize public engagement including Spanish <br />interpretation <br />o Presentation to facilitate input and discussion, using base material <br />provided by design team <br />o Preparation of written summary of meeting <br />Prioritization of Street Enhancement Elements <br />Since each community has its own needs and priorities, Consultant will work with the <br />individual neighborhoods to facilitate their determination of priorities for immediate, <br />near-term and long-term enhancements. Immediate priorities will be those low items <br />that can be cost implemented by the City or County without further design. These <br />immediate items will be prioritized in a list form to be considered for immediate <br />implementation by the City and County. <br />Near-term priorities will need further design. Conceptual designs for the near term <br />priorities will be completed as part of Task 4 of this contract. Long-term enhancements <br />are those to be implemented with future funds and will also be called out in a list form; <br />conceptual designs will not be developed for the long term enhancements. <br />As a part of the facilitation and enhancement prioritization process, we will educate the <br />three neighborhoods on the City's vision towards cleaner and more sustainable <br />transportation modes. Community outreach will be facilitated in English and Spanish. <br />Consultant recognizes that the improvements identified by the Friendly Acres, North <br />Fair Oaks, and Redwood Village neighborhoods may exceed Stanford's $1,500,000 <br />commitment. Therefore, exploration of other external funding as well as project <br />prioritization will be conducted under this task. <br />Deliverables <br />Draft and Final project logo <br />Draft and Final bilingual meeting notices and content for advertising meetings via <br />social media <br />Community Meeting materials in English and Spanish, meeting attendance lists <br />and meeting summaries <br />First round of Community Meetings (3) <br />Technical Memorandum outlining the prioritization process, its results and <br />community requests not included in the NSEP (including list of immediate <br />priorities, near term and long term priorities for each neighborhood and jointly) <br />Task 3 — Draft and Final NSEP Implementation Plan <br />Based on the efforts in Tasks 1 and 2, feedback from the communities and City staff <br />input, Consultant will develop an administrative draft NSEP for review by City and <br />County staff. This draft will include: <br />• Highlights of the Stanford Development project and its mitigation measures <br />• Community feedback from all three neighborhoods <br />• Project lists and priorities for immediate, near-term, and long-term <br />implementation <br />• Opportunities to leverage funding through other City and County programs <br />Page 11 of 15 <br />REV: 11-18-16 VR <br />ATTY/AGR.2016.322/TJKM- Neighborhood Street Enhancement Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.