My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt16 Office of Cheryl Barton
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2016
>
Agmt16 Office of Cheryl Barton
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2016 12:29:51 PM
Creation date
12/20/2016 12:26:45 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Office of Cheryl Barton
PROJECT NAME
Broadway Streetscape Project Phase 1 Conceptual Design
RMP File Number
304
Date
12/20/2016
MO Ref
16-232
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Review project site information provided by the City; and advise the City if additional is needed to <br />complete the Conceptual Design. <br />Deliverable: <br />1. Base Map <br />a. AutoCAD Rendered Plan View <br />b. Full-color high resolution PDF <br />C. 24"x36" Format <br />TASK 2 — BASE MAP DEVELOPMENT <br />Consultant shall: <br />COST: $5,650.00 <br />1. Create a scaled base sheet that shows existing conditions, for use in developing site inventory and <br />analysis graphics and concept plans. BKF will use a ground survey along with the City GIS utility data <br />base to plot existing underground utilities. The base map will assist in the evaluation of the new <br />streetscape design and impacts on the existing infrastructure. <br />Deliverable: <br />1. Base Map <br />a. AutoCAD Rendered Plan View <br />b. Full-color high resolution PDF <br />c. 24"x36" Format <br />TASK 3 —SITE INVENTORY WALK+ KICK-OFF MEETING COST: $6,091.00 <br />Consultant shall: <br />1. Undertake a site walk of the entire future scope length from Main Street to EI Camino Real with <br />City staff to review existing conditions. <br />2. Convene directly after the walk to discuss opportunities and constraints for the streetscape <br />project. <br />3. Present streetscape precedents in terms of both scale and programming opportunities to facilitate <br />the discussion. <br />Deliverable: <br />1. Meeting <br />2. Meeting Notes <br />TASK 4—SITE INVENTORY AND ANALYSIS <br />COST: $10,197.00 <br />Consultant shall: <br />1. Provide inventory and analysis of existing conditions and site factors including ADA accessibility, <br />circulation, physical features and landmarks, adjacent conditions, local connectivity. <br />2. Provide a general assessment of demographics: who is using the site, and how do they get there. <br />3. Provide a brief survey of significant cultural and natural history that may provide insights into <br />unique aspects of place that contribute to the streetscape experience. <br />Deliverable: <br />1. Inventory and Analysis Plan <br />AM/AGR/2016.309/0FFICE OF CHERYL BARTON BROADWAY STREETSCAPE <br />REV: 11-18-16 VR <br />Page 11 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.