<br /> · A detailed view of the actual work to be performed around the existing <br /> meters, highlighting the areas for separation and point of connection <br /> · Standard drawing details <br /> · Standard notes <br /> Task 5.2 - Final Construction Cost Estimate and Schedule <br /> A final estimate of probable cost and a construction schedule will be prepared for each <br /> Site. This cost estimate will include cost of materials, labor, and contractor overhead <br /> and profit. <br /> Task 5.3 - Submit Final Design Package to City <br /> A final design submittal will be prepared for each Site. The submittal will contain the <br /> final design package, a final estimate of probable cost and recycled water demand, a <br /> final construction schedule, and a checklist for the City to use in its review of the <br /> submittal. Three (3) copies of the submittal will be submitted to City staff for review and <br /> approval. One copy will be returned with review comments to Consultant. <br /> Task 6 - Design Package Approval Coordination <br /> Task 6.1 - City Approval <br /> Consultant will provide an original set of drawings to the City for signature. Once the <br /> City has approved and signed the drawings, they will be returned to the Consultant to <br /> be stamped and signed by a Registered Professional Engineer in the State of <br /> California. Consultant will convert the fully signed drawings into digital format to be <br /> posted on the Project Portal (developed under separate contract). <br /> Task 6.2 - DHS Approval <br /> Submit three (3) copies of stamped, signed Final Design Drawings to DHS on behalf of <br /> the City. The assumption is that the City will self monitor the retrofits under the DHS <br /> General Permit Guidelines and that each design package will be approved or accepted <br /> with the first submittal, with possible corrections noted. Resubmittals and revisions due <br /> to DHS comments are not included in this work effort or scope. Once DHS acceptance <br /> or signature is obtained, the design package is considered complete and ready for <br /> bidding and construction. <br /> Task 7 - Bidding Services <br /> The engineering labor effort for bidding services is developed for one "Group Bid" <br /> package that will be comprised of customer sites selected by the City. The engineering <br /> and support labor effort to execute the group 1 or subsequent group bids is estimated <br /> to be 56 hours. <br /> Task 7.1 - Prepare strategy and criteria for grouping sites into bid packages <br /> Agreement over $10K 22 <br /> KennedyJenks Rev-2 112603 <br />