My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt04 Kennedy Jenks
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2004
>
Agmt04 Kennedy Jenks
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2017 10:36:18 AM
Creation date
9/7/2004 8:42:33 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
recycled water
RMP File Number
304 (was an 802)
Date
9/3/2004
MO Ref
04-163 05-165
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Kennedy/~enks Consultants <br /> <br />Memorandum <br />Justin Ezell, Redwood City Public Works Superintendent <br />17 June 2008 <br />Page 2 <br /> <br />Discussion <br /> <br />The expanded scope of the Customer Site Retrofit & Program Support Services project is based <br />on the following items. <br /> <br />Multiple-Meter Sites: <br /> <br />Many customer sites have multiple irrigation meters rather than single meters, making the <br />retrofit more complicated than was envisioned for single-meter sites. Design and CM of <br />multiple-meter sites require greater effort than was included in the original contract fee <br />estimates. Forty-six new commercial irrigation sites encompassing 126 meters are expected <br />to be retrofitted in Group Bids 1, 2, 3, and 4, as shown in the bullets below. The First Step <br />site upgrades include an additional 11 meters and Homeowner Association retrofits will <br />include retrofit of up to 10 additional residential sites. <br /> <br />Group Bid 1: 17 sites (18 designed), 46 meters (48 designed) <br /> <br />Group Bid 2: 11 sites, 30 meters; First Step customer upgrade 11 meters at 5 sites <br /> <br />Group Bid 3: 3 sites, 18 meters <br /> <br />Group Bid 4: 15 sites, 32 meters <br /> <br />Homeowners Associations: up to 10 sites; up to 32 meters <br /> <br />Additional Group Bids: <br /> <br />The phased approach to pipeline design and construction limited the number of sites that <br />could be included in Group Bid 1. The City has determined that three additional group bids <br />are required to maintain the retrofit effort in sync with the pipeline effort. <br /> <br />Sites Not Retrofit: <br /> <br />Planning and retrofit design work was performed for four irrigation meters at three <br />commercial sites that ultimately were not retrofit-one site refused retrofit and two sites were <br />inaccessible due to the pipeline configuration. <br /> <br />Preliminary planning was performed for eight Homeowners Association sites before the City <br />decided to postpone HOA retrofits until after all commercial and City-owned sites have been <br />retrofit. Of the eight sites for which preliminary planning was done, only four are now under <br />consideration for retrofit. Therefore, preliminary planning was done for four sites that are not <br />likely to be retrofit. <br /> <br />Proaram Support Services: <br /> <br />p:lpw-proj\2004\046B025 !wc recycled retrofit & support svc\task 01 proj mgml\project memolproject memo & scope revisions\scope rev 7 - retrofit project extension & augmentation.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.