My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-01-23 Closed and Joint
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-01-23 Closed and Joint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2017 10:22:46 AM
Creation date
1/19/2017 3:58:58 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
1/23/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
645
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
b Construction plans as appropriate shall be prepared by City and provided to the <br />other parties for their approval which approval shall not be unreasonably withheld and or delayed The <br />costs associated with the preparation of the construction plans shall be part ofthe project costs and <br />City shall be reimbursed for costs incurred andor to be incurred in connection therewith upon demand <br />The playing fields shall meet all regulatory requirements applicable to such a facility <br />c Final approval of the playing fields shall reside in the Board ofTrustees of <br />District the Board of Supervisors of the County and the City Council of City and such approvals shall <br />not be unreasonably withheld andor delayed <br />d The playing fields shall meet all regulatory requirements applicable to such a <br />facility <br />e It is anticipated that establishment of the playing fields may commence in Spring <br />2000 but that due to construction at Garfield School establishment of fields at that site may take place <br />at a later date which is anticipated to be on or about Iune 2000 <br />5 Payment for Initial Repairs Restoration Establishment and Maintenance of <br />Playing Fields <br />a The County of San Mateo will bear 100 of the costs associated with <br />architectural and engineering costs and the establishment of the soccer fields at Taft estimated to be <br />7333791 The City shall be responsible for the costs if any incurred or to be incurred in cotmection <br />with the preparation of any envkonmental study or report under the California Environmental Quality <br />Act <br />b The City and the County wiil each bear 50 of architectural and engineering <br />costs and the cost of establishing the soccer fields at Garfield for an estimated total of 1100000 or <br />an estimated responsibility of 550000 each for the City and the County City shall be responsible for <br />the preparation of any environmental study or report under CEQA but County shall be responsible for <br />3 <br />6.1.B. - Page 18
The URL can be used to link to this page
Your browser does not support the video tag.