My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC16-20 0001 PC Reso 1409 El Camino
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC16-20 0001 PC Reso 1409 El Camino
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2017 4:49:17 PM
Creation date
1/19/2017 4:46:49 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
1/17/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Fire and Safetv <br />49. Emergency Radio Coverage — All building and parking garages shall have <br />approved radio coverage for emergency responders within the building. Upon <br />completion of the building construction, a radio coverage test shall be <br />conducted per the applicable codes and standards and if the test fails an <br />Emergency Responders Radio Coverage System shall be installed. Verify <br />any Blue Box phone communication requirements with the Redwood City <br />Police Department. [SDR][FIRE] <br />50. Addressing and Access —The following requirements apply: [COA][FIRE] <br />a. Addresses must be logical, sequential numbers, i.e. First Floor 101, <br />102, 103, Second Floor 202, 203, 204, as opposed to F303, G401, <br />etc. <br />b. Floor plan maps shall be submitted with unit numbers at all <br />entrances, excluding fire exits. <br />c. Provide a key pad with 24 hour access code for public safety <br />personnel at the main entrance, as opposed to just RFID readers or <br />similar devices <br />51. High -Rise Construction — The building is considered a High -Rise and must <br />comply with all codes for High -Rise construction as the height of the top <br />occupied floor slab exceeds 75 feet. Height is measured from the lowest <br />point of the gutter, at the lowest street elevation. [SDR][BUILDING] <br />52. Elevator Requirements — The following requirements for elevators apply: <br />[SDR][BUILDING] <br />a. One elevator shall be available for use as an accessible means of <br />egress in case of emergency. <br />b. One elevator shall be connected to backup generator power in order <br />to remain operable during emergencies. This elevator shall be <br />provided with appropriate signage and shall extend to all floors <br />including the lower levels of the parking structure <br />c. All additional elevators shall be connected to battery backup with <br />sufficient power to bring the elevator to the exit level in the event of <br />an emergency. <br />d. All elevators shall be equipped with smoke curtains. <br />Construction -Related Activities <br />53. Building Height — The new building is proposed at the maximum building <br />height of the zoning district at 92 ft. Include a specific note on the front page <br />of the plans submitted for building permit review notifying the building <br />inspectors to verify the maximum height in the field. All dimensions, including <br />Page 16 of22 <br />An-Y/RESO.0001/PC RESO 1409 EL CAMINO <br />REV: 01-19-17 PR <br />
The URL can be used to link to this page
Your browser does not support the video tag.