My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 LSA Associates, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 LSA Associates, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2017 11:48:50 AM
Creation date
2/6/2017 8:45:53 AM
Metadata
Fields
Template:
Agreement
Contractor Name
LSA Associates, inc
PROJECT NAME
CEQA for 1548 Maple St.
RMP File Number
304
Date
2/2/2017
MO Ref
17-006
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
will also provide an assessment of the extent to which the transportation/ traffic analysis <br />prepared for the IHSP Draft EIR can be utilized in preparing a project specific EIR for <br />the proposed project, and would include recommendations as to additional data <br />gathering and analysis that would be required for a project -specific EIR. Fehr & Peers' <br />full scope of work for preparation of the TIA is included in Exhibit B.1. <br />16. Utilities and Service Systems <br />CONSULTANT will evaluate the impacts to utilities and service systems that could <br />result from implementation of the proposed project. This section will focus in particular <br />on the ability of existing utilities and service systems to serve the project, without <br />reliance upon improvements planned as part of the IHSP. The Initial Study will identify <br />standard conditions of approval that would be applicable to the project, as necessary. <br />TASK C. PREPARE INITIAL STUDY <br />CONSULTANT will compile the analysis identified in Task B above into an Initial Study <br />for the proposed project for review by the CITY. <br />1. Administrative Draft Initial Study <br />CONSULTANT will prepare an Administrative Draft Initial Study with the following <br />components, including figures to illustrate the project location and features: <br />• Project Description <br />• CEQA Appendix G Environmental Checklist Form <br />• Mandatory Findings of Significance <br />• Contacts and Bibliography <br />An electronic copy of the Administrative Draft Initial Study will be submitted to the CITY <br />for review and comment. If desired by the CITY, CONSULTANT will schedule a <br />conference call to discuss with the CITY the comments on the Administrative Draft. <br />2. Screencheck Draft Initial Study <br />CONSULTANT will revise the Administrative Draft Initial Study based on a single set of <br />consolidated non -contradictory comments provided by the CITY. This draft is intended <br />to provide an opportunity for the CITY to review the document before it is finalized. <br />CONSULTANT will submit one electronic copy of the Screencheck Draft to the CITY. <br />3. Final Initial Study <br />Final changes to the Screencheck Draft Initial Study will be made based on minor <br />comments from the CITY. One electronic copy and five hard copies of the Final Initial <br />Study will be provided to the CITY. <br />REV: 12-15-16 VR <br />Page 15 of 19 <br />ATTY/AGR.2016.329/LSA Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.