My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-04-03 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-04-03 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2017 10:44:41 AM
Creation date
3/30/2017 4:41:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
4/3/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
399
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- Policy BE-40.6: Support the expansion of the city’s Recycled Water Service <br />Area, and actively promote widespread use of recycled water in and around <br />Redwood City. <br /> <br />The project includes dual plumbing, which initially would carry domestic water, <br />then recycled water when that system is eventually extended to the site. <br /> <br />Goal BE-41: Provide adequate and reliable wastewater collection and treatment <br />facilities that meet current and future needs. <br />- Policy BE-41.3: Minimize groundwater infiltration and inflow to the wastewater <br />collection system to maintain sufficient peak wet weather capacity and continue <br />to explore other possible options to reduce peak wet weather flow. <br /> <br />The project would provide a soil management and stormwater management <br />plans prior to construction for City and County review and approval. The plan <br />would address stormwater runoff control. <br /> <br />Goal BE-43: Advocate for access to high‐quality established and emerging <br />communications technologies to facilitate efficient and affordable communication for <br />individuals, businesses, education, and government functions. <br />- Policy BE-43.2: Require new buildings, particularly taller buildings, to be <br />designed with sufficient space to accommodate wireless communications <br />equipment. <br /> <br />The project would be required to provide approved radio coverage for emergency <br />responders within the building. Upon building completion, a radio coverage test <br />shall be conducted and if the test fails an Emergency Responders Radio <br />Coverage System would be required to be installed. The building would <br />otherwise accommodate wireless communications equipment. <br /> <br />Goal BE-44: Preserve community aesthetics while providing for utility needs. <br />- Policy BE-44.2: Continue to require the placement of utilities underground with <br />new development. <br /> <br />The project is required to underground utilities. <br /> <br />Goal BE-45: Minimize the volume of solid waste that enters regional landfills. <br />- Policy BE-45.1: Meet or exceed State mandates regarding the diversion of waste <br />from landfills. <br /> <br />The project is subject to the Waste Management Plan program, which meets or <br />exceeds State mandates on landfill diversion. <br /> <br />8.A. - Page 71
The URL can be used to link to this page
Your browser does not support the video tag.