My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Ord78 1756
RedwoodCity
>
City Clerk
>
Ordinances
>
1970-1979
>
1978
>
Ord78 1756
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:28:08 PM
Creation date
10/14/2004 10:32:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Ordinance
Date
6/26/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> "'Energy Conservation Standards - Non-Residential: <br /> 50% of the basic permit fee (subsection (a) ) . <br /> "'Noise Insulation Standards - Residential: 8% of <br /> the basic permit fee (subsection (a) ) . <br /> '" (f) (1) Notwithstanding the requirements set forth in <br /> the Building Code, Mechanical Code, Plumbing Code and <br /> Electrical Code (adopted by §§9.40, 9.70, 9.80 and <br /> 9.110, respectively) , regarding the obtaining of permits, <br /> an applicant at his option, when intending to construct <br /> a new building or structure of a type included within <br /> the groups listed in 303 (a) (2) herein, may elect to <br /> apply for a single permit in lieu of separate permits. <br /> The single permit shall be a combination of the required <br /> Building, Mechanical, Plumbing and Electrical permits. <br /> The issuance of the single permit shall be dependent <br /> upon the applicant complying with such requirements as <br /> are prerequisites to the issuance of the separate permits <br /> encompassed thereby. <br /> "'(f)(2) Prior to the issuance of a single permit <br /> combining the Building, Mechanical, Plumbing and <br /> Electrical permits, a fee shall be paid to the Building <br /> Official. Such a fee shall be the total of the fees <br /> prescribed by subsections (a) , (b) , (d) and (e) above, <br /> in addition to a fee representing the Mechanical, <br /> Plumbing and Electrical permit fees computed in <br /> accordance with the following schedule: <br /> Group Description Combined Mechanical, Plumbing, <br /> and Electrical Permit Fee Equals <br /> Percentage of Basic Permit Fee <br /> Determined from Table No. 3-A <br /> I Dwellings 60% <br /> II Apartments, Hotels, 110% <br /> Motels, Offices <br /> III Restaurants 130% <br /> IV Industrial Buildings 70% <br /> V Hospitals 150% <br /> VI Service Stations, Churches 50% <br /> VII Retail Stores 125% <br /> VIII Swimming Pools 80% <br /> '" (g) Applications submitted to the Building Department <br /> requesting inspection for the purpose of determining <br /> compliance with City Building, Housing, Plumbing, <br /> Electrical and Mechanical Codes shall be accompanied <br /> by a non-refundable fee for such service computed in <br /> accordance with the following schedule: <br /> -3- <br /> ?-. <br />
The URL can be used to link to this page
Your browser does not support the video tag.