My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-05-22 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-05-22 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2017 8:17:26 AM
Creation date
5/18/2017 3:43:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
5/22/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
386
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />SBWMA Page 4 <br />April 7, 2017 <br />Reference Section Description Modifications to Model Agreement <br /> Development of a method for coding Mixed Use Buildings in the Contractor’s <br />customer service and routing databases to allow for various reports to be generated. <br />6.02 Limitation on <br />Contamination <br /> Acknowledged that recent State regulations/legislation (e.g., AB 341, AB 1826, <br />SB 1383) may impact diversion. <br /> Revised Single‐Family and Commercial Targeted Recyclable Materials maximum <br />contamination levels in Table 1 to align with the 2013 Amendment to the 2009 <br />Franchise Agreement. <br /> Removed the quarterly contamination testing requirements (and related Attachment <br />E‐2) since contamination has not been an issue and the quarterly testing process was <br />time consuming and costly. Note that SBWMA still has right to test single loads for <br />contamination. <br /> Removed maximum contamination level provisions related to initial contract <br />implementation in 2010. <br /> Added clarification in the event an entire load is sorted to determine contamination, <br />then Contractor or its representative shall have the right to be present at, observe, <br />and photograph and video all aspects of the sort (which is consistent with the current <br />rights of Attachment E‐1). <br /> Deleted Section 6.02.F, Agency‐Directed Change in Controlling Contamination, which <br />considered the SBWMA directing a reduction in Contractor’s efforts to manage <br />Contamination and SBWMA paying Contractor for the resulting increase in <br />Contamination. <br /> Streamlined contract language generally throughout Section 6.02. <br />6.04 Processing of Other <br />Materials <br />Added clarification that an Agency request to process additional materials will be a <br />change in scope and may include adjustment of Contractor’s Compensation. <br />7.01.C Local Office Indicated that if space is not available at SRDC, that Contractor shall provide an office <br />in the SBWMA Service Area and such change will be handled as a change in scope. <br /> Revised number of allowable holidays in which the office may close from 2 to 9 <br />holidays. <br />7.02.A Customer Service Same as Section 7.01.C changes. <br />7.03.B Three‐Year Public <br />Education and <br />Technical <br />Assistance Plan <br /> Revised the entire section to specify a collaborative process of developing a Public <br />Education and Recycling Technical Assistance Plan every three years that allows the <br />SBWMA and Contractor flexibility in determining (for the coming three Rate Years) <br />the focus of the education and recycling technical assistance efforts, goal, specific <br />tasks, and reporting needs and how resources and staffing will be used. <br /> Reduced the number of Waste Zero Specialist (WZS) from 8 to 6 full‐time equivalents <br />as part of the proposed 2021 Contractor’s Compensation. Such change is shown in <br />Attachment O. Agreed that future changes in WZS staffing levels can be handled as a <br />change in scope. <br /> Acknowledged that reporting requirements will be defined in the three‐year plans. <br />7.03.D and <br />7.03.E <br />Public Education <br />Activities <br />Revised the list of public education activities to be performed by SBWMA and by <br />Contractor to reflect current practice. <br />7.04.A Commercial <br />Recycling Program <br />Staff <br /> Added requirement that if any Waste Zero Specialist position is unfilled for 90 days, <br />the Contractor and SBWMA shall meet and confer to discuss how to remedy the <br />employment gap. Also, Contractor shall compensate the Agency for the unfilled <br />position as an adjustment to the Contractor’s Compensation. <br /> Identified that if SBWMA requests to change the number of Waste Zero Specialists, <br />the change will be handled as a change in scope. <br />7.04.C Community Events Added for clarification that Attachment C presents a preliminary list of the Community <br />Events, which may be modified annually through the development of the Three‐Year <br />Public Education and Recycling Technical Assistance Plan. <br />FAX Committee Final Findings Report 04/20/2017 Attachment G: Section-by Section <br />Summary of Proposed Changes p - 4 <br />7.A - Page 34
The URL can be used to link to this page
Your browser does not support the video tag.