My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-06-26 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-06-26 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:53:14 PM
Creation date
6/22/2017 4:17:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/26/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
646
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
price rentals for additional uses thereafter. As discussed, these rental rates are based <br />upon the market rate for renting similar types of facilities within the same geographic <br />area. <br /> <br />The proposed fees were presented to the Parks, Recreation and Community Services <br />Commission on May 24, 2017, and were supported. <br /> <br />Public Works Services Fees <br />Most Public Works Services fees are based upon the actual cost of materials and staff <br />time dedicated to providing each service. Fees related to Backflow Administration are <br />recommended to decrease to the full cost, while the Water Meter fees are <br />recommended for increase to more accurately offset the costs associated with the cost <br />of meters and staff time involved in installing the meters. For the Main Tapping fee, <br />there are currently flat fees for different meter sizes. However, the study revealed that <br />the labor costs vary too greatly for a flat or fixed fee. Therefore, staff recommends <br />assessing the fee on an hourly basis to recover the full cost. <br /> <br />The study also revealed the hourly rate charged for the EV charging station is slightly <br />under-recovered for Level II charging stations. Therefore, staff recommends adjusting <br />the fee to $2.00/hour. It is important to note that the EV charging station hourly rate is <br />similar to parking meter rates and is not subject to user fee regulations. <br /> <br />One proposed new fee is an administrative fee for backflow prevention assemblies <br />when a customer fails to respond to the City’s notice to test the device and then <br />receives a termination notice. The fee captures the additional staff time involved in <br />administering the termination process. <br /> <br />Another proposed new fee is to cover the cost of performing industrial and commercial <br />stormwater inspections previously provided by the San Mateo County Environmental <br />Health Division. The City is required by the Municipal Regional Stormwater Permit <br />(MRP) to conduct regular stormwater inspections of industrial and commercial facilities <br />and report to the Regional Water Quality Control Board. The San Mateo County <br />Environmental Health Services Division has provided inspection services on behalf of <br />the City since 1996 to comply with Provision C.4 of the MRP under a Memorandum of <br />Agreement (MOA). However, the Environmental Health Services Division notified cities <br />with MOAs of its intent to terminate stormwater inspection agreements on December <br />31, 2017, due to staffing and cost concerns. The Division is currently not fully recovering <br />the cost of implementing the existing MOA through the fees charged to businesses. <br />Going forward, the City will be required to conduct or otherwise provide for an estimated <br />7.A. - Page 7
The URL can be used to link to this page
Your browser does not support the video tag.