My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-06-26 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-06-26 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:53:14 PM
Creation date
6/22/2017 4:17:46 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
6/26/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
646
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF REDWOOD CITY, CALIFORNIA <br />Cost of Services (User Fee) Study <br />Matrix Consulting Group Page 33 <br /> <br />8. PUBLIC WORKS <br /> <br /> The Public Works Department oversees a variety of services on behalf of the City <br />of Redwood City. These services include fleet maintenance, facilities maintenance, <br />custodial services, right-of-way management, wastewater management, and water <br />utility services. The fees analyzed in this report relate primarily to Utility Fees and <br />Electrical Vehicle Charging Stations. <br />1. UTILITY FEES <br />The Utility Fees evaluated in this report specifically relate to Water Meters, Fire <br />Service Line, After Hours Turn On / Turn Off Fees, and Backflow Inspection Fees. A <br />comparative survey of these fees has also been included as an attachment to this <br />report. The following subsections discuss the results of the study for each of these <br />areas. <br />(1.1) Water Meter Fees <br />The City of Redwood City currently charges a fee for service for water meters <br />that are furnished and installed by the City. These fees were established by Ordinance <br />2146, and have remain unchanged since 1998. The project team worked with staff in <br />the Public Works Department to obtain updated information regarding labor hours and <br />material costs associated with the different meter sizes. The following table shows the <br />current fee, the full cost per unit, and the associated surplus / (deficit) for each of the <br />different meters. <br />Fee Name Current Fee Total Cost Per Unit Surplus / (Deficit) <br />5/8" $150 $475 $(325) <br />¾” $175 $508 $(333) <br />1" $200 $570 $(370) <br /> <br /> <br /> <br /> <br />7.A. - Page 45
The URL can be used to link to this page
Your browser does not support the video tag.