My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2017
>
Reso PC17-07 0032 PC Reso Approving CEQA - 860 Charter St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 4:18:31 PM
Creation date
6/28/2017 4:06:28 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Table 1: Mitigation Monitoring and Reporting Program <br /> <br />Impact <br /> <br />Mitigation Measures <br />Timeframe for <br />Implementation <br />Responsibility for <br />Implementation <br />Oversight of <br />Implementation <br />See previous page CUL-1b Continued <br /> <br />This mitigation may include, but is not limited to, a <br />thorough recording of the resource on Department of Parks <br />and Recreation Form 523 records, or archaeological data <br />recovery excavation. If data recovery excavation is <br />warranted, CEQA Guidelines Section 15126.4(b) (3) (C), <br />which requires a data recovery plan prior to data recovery <br />excavation, shall be followed. If the significant identified <br />resources are unique archaeological resources, mitigation of <br />these resources shall be subject to the limitations on <br />mitigation measures for archaeological resources identified <br />in CEQA Sections 21083.2(c) through 21083.2(f). <br />See previous page See previous page See previous page <br />Construction activities associated <br />with the proposed project could <br />uncover paleontological <br />resources beneath the surface of <br />the project site. <br />CUL-2: If paleontological resources are encountered during <br />site preparation or grading activities, all work within 50 feet <br />of the discovery shall be redirected until a qualified paleon- <br />tologist has assessed the discoveries and made a determina- <br />tion of the resource’s significance, and the City of Redwood <br />City and County of San Mateo shall be notified. Paleonto- <br />logical resources include fossil plants and animals, and <br />evidence of past life such as trace fossils and tracks. <br /> <br />If the paleontological resources are found to be significant, <br />adverse effects to such resources shall be avoided by project <br />activities to the extent feasible. If project activities cannot <br />avoid the resources, the adverse effects shall be mitigated in <br />accordance with CEQA Guidelines Section 15126.4(b) (3). <br />Mitigation may include data recovery and analysis, <br />preparation of a final report, and the formal transmission or <br />delivery of any fossil material recovered to a paleontologi- <br />cal repository, such as the University of California Museum <br />of Paleontology (UCMP). Upon completion of project <br />activities, the final report shall document methods and <br />findings of the mitigation and be submitted to the City of <br />Redwood City, County of San Mateo, and a suitable <br />paleontological repository. <br />During all <br />phases of <br />construction. <br />Project Applicant Redwood City <br />Community <br />Development <br />Director <br />ATTY/RESO.0032/PC RESO APPROVING CEQA - 860 CHARTER ST. EXHIBIT B <br />REV: 06-15-17 PR <br /> <br />Page 4 of 9
The URL can be used to link to this page
Your browser does not support the video tag.