My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 LSA Associates, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 LSA Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/29/2017 3:11:52 PM
Creation date
6/29/2017 3:10:15 PM
Metadata
Fields
Template:
Agreement
Contractor Name
LSA Associates, Inc.
PROJECT NAME
Kaiser MOB 2 EIR
RMP File Number
304
Date
6/29/2017
MO Ref
17-118
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
changes to the proposed work program. The NOP, along with the written comment <br />letters received on the NOP, will be included as an Appendix of the Draft SEIR. <br />Project Description <br />LSA will prepare a project description that clearly describes the development planned <br />for the site and project area in previous planning documents (including the 2003 Precise <br />Plan EIR and 2010 Addendum). LSA will work closely with City staff to ensure that the <br />project description provides a level of detail appropriate for its objectives. <br />The project description will provide as much detail as is available from the City and the <br />applicant team. At a minimum, a preliminary site plan and elevations will be provided. <br />Included in the project description will be a summary of the project site background, <br />including development assumptions under the Precise Plan. Any difference between <br />this document and the proposed project will be highlighted. The project description will <br />also summarize the overall approval process for the project and identify all discretionary <br />and anticipated subsequent approvals. Relevant agencies and reviewing bodies will be <br />identified. The project description will include maps to illustrate the project site vicinity <br />and the project site's relationship to surrounding areas and land uses. <br />LSA shall submit a draft of the project description to the City and the applicant team for <br />review and acceptance before the LSA team begins conducting any impact analyses. <br />An abbreviated version of the project description will be included in the Initial Study, as <br />discussed in more detail below. <br />Significance Criteria <br />Where appropriate, LSA will use the significance criteria used in the Precise Plan EIR. <br />However, LSA will prepare a memorandum that includes the significance criteria used in <br />the Precise Plan EIR and highlight changes to that criteria that have occurred since its <br />certification. For example, the topic of greenhouse gas emissions was not considered in <br />the Precise Plan EIR, and LSA shall use the current criteria for analysis of this issue <br />topic. Early agreement regarding significance criteria will help to focus the setting <br />information and the impact analyses provided in the SEIR. <br />Work Program Refinement <br />It may be necessary to refine the work program in accordance with information compiled <br />in the above subtasks. Upon receipt and review of all of the comments on the NOP and <br />taking into consideration comments heard at the scoping session, LSA will work with <br />City staff to refine the scope of work and budget, if necessary, to address any <br />environmental issues that are not yet adequately addressed in this work program. <br />TASK B. DRAFT INITIAL STUDY <br />LSA will prepare an Initial Study to focus out environmental topics that do not warrant <br />detailed analysis in the SEIR. The following tasks will be completed for the Initial Study. <br />Page 10 of 18 <br />REV: 06-16-17 PR <br />ATTY/AGR.2017.138/LSA - KaiserMOB2EIR <br />
The URL can be used to link to this page
Your browser does not support the video tag.