Laserfiche WebLink
Identify mitigation measures. LSA will identify, where necessary, practical mitigation <br />measures to address any significant project or cumulative impacts. Mitigation may <br />include sustainable development practices and design measures, site disturbance <br />reduction measures, energy conservation measures and renewable energy sources, <br />solid waste reduction measures, and water conservation and efficiency measures. LSA <br />will provide a summary, to the extent information is available, of the expected <br />percentage reduction of greenhouse gas emissions from the recommended mitigation <br />measures and project features. <br />2. CEQA-Required Assessment Conclusions <br />LSA will prepare the appropriate conclusions to fulfill CEQA requirements by providing <br />assessment of the mandatory impact categories including: <br />• Growth -inducing impacts <br />• Effects found not to be significant (with a summary of the Initial Study findings); <br />• Unavoidable significant environmental impacts; and <br />• Significant irreversible environmental changes which would be caused by the <br />proposed project, should it be implemented. <br />3. Administrative Draft Supplemental EIR <br />The information developed in Tasks CA and C.2 will be refined and organized into an <br />Administrative Draft SEIR. The SEIR is expected to include the following components: <br />• Table of Contents <br />• Introduction <br />• Executive Summary and Impact and Mitigation Summary Table <br />• Project Description (developed as part of Task A, above) <br />• Setting, Impacts and Mitigation Measures <br />• CEQA-Required Assessment Conclusions <br />• List of Persons and Organizations Contacted <br />• Bibliography <br />• Technical Appendices (as needed) <br />As noted in Task B.3, the Screencheck Initial Study will also be included as an appendix <br />to the Administrative Draft SEIR. <br />Up to five (5) paper copies and one MS Word and PDF version of the Administrative <br />Draft SEIR will be submitted to the City for review and comment. At the end of the City's <br />review, LSA will be available to meet with City staff to discuss comments on the <br />Administrative Draft SEIR. <br />4. Screencheck Draft Supplemental EIR <br />LSA will amend the Administrative Draft SEIR based on one set of consistent and non - <br />contradictory comments received from City staff. LSA has allotted a reasonable amount <br />of time for responding to changes; however, if this task were to exceed the cost allotted <br />in the budget due to changes in the project description or requests for additional <br />analysis that are not necessary to prepare a legally adequate document, the additional <br />Page 15 of 19 <br />REV: 06-16-17 PR <br />AM/AGR.2017.138/LSA - KaiserMOBMR <br />