My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt96 Kennedy Jenks Consultant
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1996
>
Agmt96 Kennedy Jenks Consultant
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:27:43 PM
Creation date
11/4/2004 11:09:30 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Kennedy Jenks Consultants
PROJECT NAME
water reservoir demolition
RMP File Number
304
Date
3/20/1996
Reso Ref
12701
Box
5858
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />· Photographing existing facilities <br />· Obtaining field measurements, but not conducting a topographic survey <br />· Conducting a preliminary reconnaissance of the facilities to estimate the potential for hazardous <br /> materials <br />· Obtaining paint samples and having them analyzed for lead content <br />· Preparing a summary page documenting the findings. <br />Brewster #1  <br />The work items associated with the two tanks at this site include: <br />· Obtaining and reviewing existing plans <br />· Photographing existing facilities <br />· Conducting topographic surveys <br />· Calculating preliminary earthwork quantities <br />· Preparing a summary page documenting the findings. <br />California #1  <br />The work items associated with the two tanks at this site include: <br />· Obtaining and reviewing existing plans <br />· Photographing existing facilities <br />· Obtaining field measurements, but not conducting a topographic survey <br />· Preparing a summary page documenting the findings. <br />Easter Cross <br />The work items associated with the two tanks at this site include: <br />· Obtaining and reviewing existing plans <br />· Photographing existing facilities <br />· Conducting topographic surveys <br />· Analyzing three alternative types of tank construction (bolHogether steel tanks, welded steel <br /> tanks, and cast-in-place concrete tanks) <br />· Developing a maximum of 3 alternative layouts including preliminary landscaping plans <br /> 2 <br /> T <br />
The URL can be used to link to this page
Your browser does not support the video tag.