My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 HydroScience Engineers, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 HydroScience Engineers, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/8/2017 12:30:13 PM
Creation date
8/8/2017 12:26:11 PM
Metadata
Fields
Template:
Agreement
Contractor Name
HydroScience Engineers, Inc.
PROJECT NAME
Sanitary Sewer Pump Station Improvement Project (P.S. No. 18 and P.S. No. 20)
RMP File Number
304
Date
8/7/2017
MO Ref
17-136
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. SCOPE OF SERVICES <br />Consultant shall perform and provide the following: <br />TASK 1 -PROJECT MANAGEMENT <br />This task includes the overall management of the project. This task includes, but is <br />not limited to the following: <br />1. Consultant shall provide project coordination; communicating project issues with <br />the City; setting up the project plan; preparing and maintaining a project <br />decision log; design schedule including developing the project work plan; <br />preparing a project schedule as well as maintaining, monitoring and updating <br />that schedule; tracking and reporting job progress. <br />2. Consultant shall perform Quality Control Reviews and Quality Assurance of <br />submittals. <br />3. Consultant shall attend five (5) meetings (not including Task 8) with City staff; <br />Project kick-off meeting, Basis of Design Report Review meeting, 75% Design <br />Review meeting, 95% Final Design review meeting, and pre -construction <br />meeting. Consultant shall confirm attendance, prepare agendas and meeting <br />notes, provide handouts, and coordinate action items at each meeting. <br />Deliverables: <br />• Electronic PDF of the project decision log, with periodic updates shall be issued <br />as needed by the Consultant <br />• Electronic PDF and hard copy of the project schedule, with periodic updates shall <br />be issued monthly by the Consultant <br />• Detailed invoices - hard copies shall be submitted monthly by the Consultant <br />• Project status reports shall be submitted monthly via email in PDF format by the <br />Consultant <br />• Meeting agenda and minutes shall be submitted via email in electronic formats <br />by the Consultant <br />• QA/QC Plan and Documentation shall be submitted via email in PDF format by <br />the Consultant <br />TASK 2 -SURVEYING AND UTILITIES RESEARCH <br />This tasks includes the surveying and utilities research for the project. The tasks <br />include, but are not limited to the following: <br />1. Consultant shall research and review the existing utilities from City as -built <br />plans and private utility companies. <br />2. Consultant shall prepare the topographic base mapping for the project. All <br />surface features (e.g. drain inlets, trees, water valves, utilities' invert <br />elevations, etc.), utility information and base mapping approximately 20 feet <br />beyond the limits of the project shall be included. <br />ATfY/AGR/2017.149/HYDROSCIENCE ENGINEERS, INC. <br />REV: 06-30-17 PR <br />Page 12 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.