My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-21-24 VR <br /> <br />Task 2.1 Data Collection & Site Reconnaissance – Collect project plans and as-builts <br />from the past three years and review the project area for changes. <br />Task 2.2 Field Surveys – Survey project area changes that occurred during the past <br />three years. <br />Task 2.5 Utility Identification and Verification – Re-engage utility companies and <br />check for any updated information. <br />Task 2.6 Design Reports – Prepare updated design reports. <br />1. Hydromodification Memorandum <br />2. Storm Water Data Report (including coordination with the Harbor View <br />project and updating for the 2012 MS4 permit) <br />3. Drainage Report (including trash collection) <br />4. Foundation Reports/Log Of Test Borings (including updates to new seismic <br />criteria) <br />5. Geotechnical Design Report <br />6. Materials Report <br />7. Project Hazardous Materials Test Report <br />8. ROW Hazardous Test Report <br />9. Asbestos/Lead Based Paint/PCB Test Report <br />10.Lane Closure Report <br />11.Transportation Management Plan <br />12.Landscape/Aesthetics Concept Plan <br />Task 2 Deliverables will include: <br />Updated Utility Agreements for execution <br />Updated Design Reports: <br />o Hydromodification Memorandum <br />o Storm Water Data Report <br />o Drainage Report <br />o Foundation Reports with LOTBs <br />o Geotechnical Design Report <br />o Materials Report <br />o Project Hazardous Materials Test Report <br />o R/W Hazardous Test Reports <br />o Asbestos/Lead Based Paint/PCB Test Reports <br />o Lane Closure Report <br />o Transportation Management Plan <br />o Landscape/Aesthetics Concept Plan <br />Task 3: 65% PS&E Phase – Consultant will resubmit the 65% Structure PS&E Submittal. <br />A revised 65% PS&E Structure Submittal will be required due to the implementation of <br />the new Seismic Design Criteria (SDC 2.0), revisions to the design code, updates to <br />Caltrans design manuals, updates to the Caltrans Standard Plans and updates to revised <br />CADD standards. <br />ATTY/AGR.2024/Amend. No.7/AECOM TECHNICAL SERVICES (US 101 & WOODSIDE ROAD INTERCHANGE PS&E) (Page 5 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.