My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 AECOM Technical Services, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 AECOM Technical Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 3:14:29 PM
Creation date
8/23/2017 1:00:27 PM
Metadata
Fields
Template:
Agreement
Contractor Name
AECOM Technical Services, Inc
PROJECT NAME
101/84 PS&E
RMP File Number
701
Date
8/21/2017
MO Ref
17-148 22-106 23-027
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 05-21-24 VR <br />Task 4.6 Quantities and Cost Estimate <br />Consultant will update the Construction Quantities and Estimate submitted in the previous <br />95% PS&E submittal. Consultant will submit quantity calculations showing all sketches, <br />diagrams and dimensions necessary for their use by field inspectors. <br />Task 4.7 Construction Schedule <br />Consultant will update the Construction Schedule submitted in the previous 95% PS&E <br />submittal and will notify Caltrans and the City of any difference between the update and <br />the previous version. <br />Consultant will coordinate highway and structure construction schedule information to <br />prepare the Project Construction Schedule. <br /> <br />Task 4.8 Draft PS&E Forms <br />Consultant will update the Draft PS&E Forms submitted in the previous 95% PS&E <br />submittal and complete the documents for final review. Consultant will also update the <br />following Draft Forms: <br />Quality Control Certification of First Submittal to District Office Engineer (DOE) <br />First Submittal to DOE Checklist <br />Task 4.9 QC Review <br />Consultant will perform an in-house Final 95% PS&E Quality Control review. <br />Task 4.10 Independent Design Check - Structures <br />An updated independent check of the bridge structures and non-standard retaining walls <br />utilizing the unchecked details (65%), the new seismic design criteria (SDC 2.0), revisions <br />to the design code, updates to Caltrans design manuals, updates to the Caltrans <br />Standard Plans, the Foundation Reports and other pertinent reports and information will <br />be performed. An independent set of checker's calculations to verify the design of all the <br />plan details will be developed. The checker will be responsible for developing an <br />independent set of quantity calculations. <br />Check calculations shall include analysis and computations that are necessary to <br />independently check all aspects of the design shown on the unchecked details. Results <br />from the check calculations shall be compared with the design. Discrepancies shall be <br />resolved between the designer and checker and the resolutions documented in the <br />calculations. <br />95% PS&E Deliverables will include: <br />Design Standard Decision Document <br />ATTY/AGR.2024/Amend. No.7/AECOM TECHNICAL SERVICES (US 101 & WOODSIDE ROAD INTERCHANGE PS&E) (Page 8 of 13)
The URL can be used to link to this page
Your browser does not support the video tag.