Laserfiche WebLink
perform lane closure calculations per Caltrans' standard methodology and submit draft <br />lane closure report to Caltrans for review. This will also include Late Lane Closure <br />Pickup calculations. <br />I1. Transportation Management Plan <br />AECOM will prepare a Transportation Management Plan (TMP) in accordance with the <br />City's and Caltrans current requirements. The TMP is a specialized program tailored to <br />prevent and mitigate the impacts of a construction project by applying a variety of <br />techniques including Motorist Information, Incident Management, Construction <br />Strategies, and Public Information Strategies. The major objectives of the TMP are to <br />maintain efficient and safe movement of vehicles, bicycles, and pedestrians through the <br />construction zone; and to provide intensive public awareness of potential impacts in the <br />vicinity of the project site. Detour routes will also be identified and included in the TMP <br />report. Access will be maintained for emergency response vehicles. A trail closure plan <br />will be developed for the Bay Trail, to minimize the number of closure days, provide <br />detour routes, and communicate to the public with a signage plan and notices posted at <br />Bay Trail access points. <br />12. Landscape/Aesthetics Concept Plan <br />AECOM will prepare a landscape/aesthetics concept for the project in coordination with <br />the City, Caltrans and affected stakeholders. Proposed trees will be located individually <br />and identified by name or graphically keyed. Proposed shrubs will be shown in massed <br />formations, and ground covers will be identified with textured pattern. A plant list will be <br />provided listing proposed plants and possible materials from which the final selection will <br />be made. Irrigation crossovers for future use will also need to be identified and shown on <br />the concept plan. <br />The task will include preparation of a CADD based landscape concept based upon goals <br />determined through meetings with the stakeholders, based upon field work knowledge of <br />Caltrans design criteria, and based upon previously approved concepts in the project area. <br />Recycled water for irrigation supply will also be considered. The concept will be <br />presented in graphic format and CADD line colored. With comments received, a final <br />concept will be prepared and in CADD line color. A preliminary construction cost <br />estimate will be prepared. <br />Work performed includes the following work activities: <br />• Develop Landscape Conceptual Design (includes one landscape planting concept <br />plan and one revised planting concept plan <br />• Prepare two (2) photo -simulations <br />• Attend 5 meetings with the stakeholders and 1 public meeting for the preparation <br />of landscape design and 2 meetings for the preparation of planting and irrigation <br />plan <br />• Provide aesthetics design of retaining walls, bridges, rails, fences abutments and <br />bridge lights <br />Page 30 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PSBE <br />