Laserfiche WebLink
Task 2 Deliverables <br />• Updated Master Geometric Electronic Files <br />• Geotechnical Sample/Testing/Boring Work Plan <br />• Utility Agreement Input <br />• Draft Design Reports: <br />o Hydromodification Memorandum <br />o Storm Water Data Report <br />o Drainage Report <br />o Foundation Reports with LOTBs <br />o Geotechnical Design Report <br />o Materials Report <br />o Project Hazardous Materials Test Report <br />o R/W Hazardous Test Report <br />o Asbestos/Lead Based Paint/PCB Test Report <br />o Lane Closure Report <br />o Transportation Management Plan <br />o Landscape/Aesthetics Concept Plan <br />TASK 3 65% PS&E PHASE <br />The purpose of Task 3 is to develop draft plans, specifications and quantities for the 65% <br />PS&E design, and includes finalizing the right-of-way, utility relocations and proposed <br />easements, and responding to comments received from the agencies reviewing Task 2 <br />submittals and identifying and resolving conflicts. The submittal will consist of all design <br />documents that are required for the Project. <br />AECOM will coordinate the plans, specifications and estimates with those of other design <br />consultants and assure that highway design interfaces with structures design. AECOM's <br />activities will include: <br />Task 3.1 Design Exceptions <br />AECOM will review the Project to assess the need for additional mandatory and advisory <br />design exceptions that may be required prior to commencing detailed design work. <br />Additional design exceptions, if discovered, will be submitted as a list at the 65% PS&E <br />Phase. <br />Task 3.2 Highway Plan Sheets <br />AECOM will prepare, coordinate and submit Design Plan Sheets in English units for all <br />highway design, and assure that interface information is provided to the other design <br />consultants. The drawings are to be in MicroStation CADD V8i format and must be in <br />compliance with Caltrans' requirements. AECOM will prepare the necessary Design Plan <br />Sheets: <br />Page 31 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PS&E <br />