Laserfiche WebLink
I . Geometric Base Sheets will be prepared at a scale of I"= 50'. Base sheets will <br />include basic horizontal and vertical layout information and identify all major <br />construction features. These sheets will include the topographic base mapping. <br />2. Tvoical Cross Sections (no scale) for the highway will be based on the approved <br />standard sections, including pavement structural sections. <br />3. Profiles/Sunerelevation Diagrams (scale: horiz. 1"=50', vert. 1"=10') will be <br />prepared as needed for all new construction. It is anticipated that mainline vertical <br />design data will be detailed on pavement elevation sheets. <br />4. Utility Relocation/Occunation Plans (scale I"=50') AECOM will identify and <br />propose existing and final locations of all known utilities that are affected by the <br />Project, such as gas, electric, cable TV, telephone, sanitary sewer, storm water and <br />water. The relocation design will be the responsibility of the utility owner: <br />Owner Type Location I Length <br />City of 10" Water Relocation near Bay 253 <br />Redwood City Rd <br />City of 10" Water with 252' of 16" Relocation under 1063 I <br />Redwood City Casing Woodside Rd <br />City of 6" Water with 62' of 12" Relocation under 324 <br />Redwood City Casing Veterans Blvd <br />City of 18" Sanitary Sewer w/ 245' of Relocation under 312 1 <br />Redwood City 24" Casing Veterans II <br />FOSMD 30" Sanitary Sewer w/ 245' of Broadway to Across 888 <br />36" Casing Veterans <br />FOSMD 30" Sanitary Sewer w/ 36" Across Seaport 426 <br />Casing <br />FOSMD Extend 16" Casing for 12" Across US101 228 <br />Sanitary Sewer <br />5. Drainage Layout Sheets AECOM will prepare the preliminary Drainage <br />Plans/Profiles and Detail Sheets. The design efforts will be coordinated with other <br />design disciplines of the Project Team. Drainage plans will be prepared at a scale of <br />I"=50' showing existing and proposed drainage systems. <br />6. Pavement Delineation, will be prepared at a scale of 1"=50'. <br />7. Sign Plan (scale I"=50') A field survey will be conducted and used to develop <br />inventory of existing roadway signs and will be confirmed with as-builts found. Sign <br />plans will be developed depicting both existing and proposed signs within the project <br />limits. <br />Page 32 of 73 <br />REV: 07-18-17 PR <br />ATTY/AGR.2017.166/AECOM 101/84 PSBE <br />