Laserfiche WebLink
• Updated CAD electronic submittals <br />• Updated Response to 100% PS&E Comments <br />Task 7 Right of Way Support <br />The following subtask will be conducted. <br />7.5 Utility Certification — CONSULTANT will include the sanitary sewer and water relocation <br />efforts into the Utility Certification that conforms to the forms and guidelines mentioned in <br />Appendix LL of the Caltrans Project Development Procedures Manual. <br />Task 7 Deliverables (to CITY and Caltrans) <br />• Updated Utility Certification Documents <br />(2) Incorporate Cement Deep Soil Mix (CDSM) Design <br />The scope of work for (2) Incorporate Cement Deep Soil Mix (CDSM) Design is described <br />below. <br />Scope of Work <br />CONSULTANT will complete the additional services described below, which are necessary to <br />provide ground improvement recommendations and design as part of the PS&E and RNV Support <br />Phase of the 101/84 (Woodside Road) Interchange Improvement Project. <br />Incorporate CDSM <br />The design scope was originally determined based on findings of the PA&ED phase, which <br />included standard methods for managing settlement. Through collaboration with Caltrans during <br />the Structure Type Selection process, it was determined that Cement Deep Soil Mix (CDSM) was <br />the best way to control and minimize settlement. This is expected to simplify construction, <br />decrease the construction timeframe, and significantly reduce the risk associated with settlement. <br />Additional design services are necessary to define design parameters for CDSM, which requires <br />geotechnical analysis, modified foundation reports, and additional design details. <br />The scope of work for incorporating CDSM into the Project will include the following additions <br />and/or modifications to subtasks, as described in the Original Agreement. <br />2.6.4 Foundation Reports/Log of Test Borings — CDSM analysis will be completed and <br />incorporated into the foundation reports, for approval by Caltrans. This will include the following <br />subtasks. <br />• Review Design Standards — Design of CDSM, also known as Deep Mixing Methods (DMM), <br />will be in accordance with the following manuals: (a) Caltrans Geotechnical Manual, Ground <br />Improvement; (b) FHWA Ground Improvement Manual; and (c) FHWA DMM Manual. <br />• DMM Geometry —Trial DMM geometry will be established for the engineering analysis. <br />• Engineering Analysis — This will include a determination of the replacement ratio as needed <br />and the minimum depth of the treatment required. <br />• Constructability, Instrumentation, and QAIQC — This will include addressing constructability <br />issues, providing instrumentation requirements for the Project, providing QA/QC review, and <br />incorporating recommendations. <br />ATTY/AGR/2019/AMENDMENTS/AMEND NO.2—AECOM 101/84 PS&E <br />REV: 07-03-19 D2 <br />Page 7 of 13 <br />