My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2004-11-22
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2000-2009 partial
>
2004
>
AgdaPkt 2004-11-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:08 PM
Creation date
11/18/2004 12:58:53 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
11/22/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />5 Ø~2 <br />The project will repair damaged sidewalk, drivèway approach, and curb and gutter at any <br />location in the City where the property owners agree to pay one-half the cost of concrete <br />construction. There is no charge to the property owner for associated tree root pruning or <br />street paving. The contract includes the construction of wheel chair ramps at locations <br />identified by resident requests. <br />Staff has continued to follow the direction from the City Council and Tree Policy Task Force <br />in the approach to this program. Tree work for the project will be coordinated and <br />performed by the City's tree maintenance staff or annual tree maintenance contractor as <br />resources are available. Root pruning versus tree removal decisions will be determined on <br />a case by case basis, with the first priority being to preserve trees. <br />When possible, the City will encourage property owners to preserve the tree by allowing <br />the City to establish a sidewalk maintenance easement on private property for the <br />relocation of the sidewalk. This creates adequate space between the tree and new <br />sidewalk to perform root pruning. If an easement to preserve the tree cannot be agreed <br />upon, staff may skip the site and perform a temporary sidewalk repair to maintain a usable <br />sidewalk, and revisit the location for concrete repair at a future date. <br />Alternatives <br />Re-bid the project. Staff does not believe re-bidding will generate a lower bid price. <br />Fiscal Impact <br />The City Council approved a one million dollar appropriation in the FY 2004-2005 Capital <br />Improvement Program, Tree Preservation and Sidewalk Repair and Wheel Chair Ramp <br />Construction. In addition, staff estimates that property owners will reimburse the City <br />approximately $119,500 for their share of the construction costs. <br />The FY 04-05 budget will be expended as follows: <br />Funding: <br />Carry-over from 03-04 $ 56,750 <br />Approved Project budget FY 04-05 $1,000,000 <br />Estimated property owner contributions $ 119,500 <br />Total estimated funding $1,176,250 <br />Expenditures: <br />2004-2005 Cost Shared Project - - $ 336,250 <br />2004-2005 Tree Preservation and Sidewalk $ 540,000 <br />Inspection and administration $ 160,000 <br />Commitment toward Cinema hardscape $ 90 ,000 <br />Total planned expenditures $1,126,250 <br />Balance for contingencies (5%) $ 50,000 <br />¿;b~ <br />ordon Mann <br />Public Works Superintendent <br />Attachments <br />Letter of Annullment <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.