My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt17 Waterworks Industries, Inc
RedwoodCity
>
City Clerk
>
Agreements
>
2010-2019
>
2017
>
Agmt17 Waterworks Industries, Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2020 3:45:21 PM
Creation date
9/7/2017 2:44:57 PM
Metadata
Fields
Template:
Agreement
Contractor Name
Waterworks Industries, Inc.
PROJECT NAME
Redwood Shores Lagoon Aquatic Plant Management
RMP File Number
304
Date
9/7/2017
MO Ref
17-153, 18-028
Link Groups
Link
1:
Agmt17 Waterworks Industries, Inc
Last modified:
9/10/2020 3:45:21 PM
Path:
\City Clerk\Agreements\2010-2019\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Reporting. Prepare and submit to the City conclusions and recommendations <br />for short term actions and long-term work plans. The following reports are due <br />to the City, no later than 15 days after the due date: <br />• Monthly - Copies of monthly summary pesticide use report submitted to <br />San Mateo County Department of Agriculture for all herbicides / <br />pesticide used. <br />• Monthly - Compilation of daily activity reports, separate activity report <br />for each activity day, each activity (e.g. monitoring / survey, spraying, <br />harvesting, trash/cleanup, etc.), including photos. <br />• October 31 - End of season summary, indicating plant growth <br />observations and trends, assessment of control strategies, and <br />recommendations for the coming year. <br />d. Mechanical Harvesting. Following the draft Lagoon Management Plan: <br />Redwood Shores Lagoon, July 2003, as amended, identify needs, set <br />schedules, notify and advise the City on recommended mechanical harvesting. <br />Provide skilled staff, equipment and materials to carry out work safely and <br />pursuant to County, State and Federal laws. <br />e. Chemical Applications. Following the draft Lagoon Management Plan: <br />Redwood Shores Lagoon, July 2003, and any amendments thereof with the <br />exception of the use of the copper -based algaecides EarthTec, AgriTec and <br />Cutrine-Plus, identify needs, set schedules, notify and advise the City of <br />recommended algaecide and herbicide treatments. Provide state licensed and <br />/ or certified skilled staff, equipment and chemicals to carry out work <br />applications safely and pursuant to County, State and Federal laws. Specify <br />name(s) of the registered pesticide applicator(s) that will perform chemical <br />application activities. <br />f. Equipment. Dedicate the following equipment to the project for the term of the <br />Agreement: A minimum of two (2) aquatic harvesters are required to be <br />dedicated for the duration of the project to assist in aquatic weed and algae <br />removal. Provide contingency / back up plan to ensure continual service to <br />Redwood City, particularly during the high plant growth period, in the event of <br />equipment failure or maintenance. <br />g. Lagoon Management Plan. Work with the City of Redwood City to update the <br />draft Lagoon Management Plan: Redwood Shores Lagoon, July 2003 to <br />incorporate all changes required since 2003 to perform maintenance operations <br />on Redwood Shores Lagoon. <br />REV: 08-18-2020 EI <br />ATTY/AGR.Amend No. 3/WATERWORKS INDUSTRIES, INC. (Page 5 of 7) <br />
The URL can be used to link to this page
Your browser does not support the video tag.