My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2017-09-11 Closed and Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2010-2019
>
2017
>
AgdaPkt 2017-09-11 Closed and Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2017 12:51:50 PM
Creation date
9/7/2017 6:06:39 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council and Successor Agency and Public Financing Authority
Date
9/11/2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
530
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7.A. - Page 112 <br /> LSA ASSOCIATES, INC. ROCKETSHIP REDWOOD CITY ELEMENTARY SCHOOL PROJECT <br /> SEPTEMBER 2016 INITIAL STUDY/MITIGATED NEGATIVE DECLARATION <br /> 3. Operations at an unsignalized intersection to deteriorate from an acceptable level(LOS D <br /> or better)to an unacceptable level(LOS E or F); or <br /> 4. Delay at an unsignalized intersection operating at an unacceptable level(LOS E or F)to <br /> increase by five seconds or more; and traffic volumes at the intersection satisfy the Caltrans <br /> peak-hour volume signal <br /> County of San Mateo.According to the County of San Mateo Traffic Impact Study Require- <br /> ments,a project is considered to have a significant impact if, for either peak hour,either of the <br /> following conditions occurs:110 <br /> 1. For intersections currently in compliance with the level of service standard,a project will <br /> cause the intersection to operate at a level of service that violates the overall standard of <br /> LOS C with no individual movement operating at worse than LOS D. On occasion,LOS D <br /> may be allowed for peak periods in very dense urban conditions at the County's discretion. <br /> 2. For intersections currently NOT in compliance with the level of service standard,a project <br /> will cause the intersection to operate at a level of service that violates the standard LOS <br /> mentioned above and the proposed project increases average control delay and individual <br /> movements at the intersection by 4 seconds or more. <br /> Minimum LOS standards for County intersections are typically LOS C or better;however,an LOS D <br /> standard may be allowed for peak periods in very dense urban conditions per the County's discretion. <br /> Because the study area is considered urban,a LOS D standard was applied to intersections as a whole <br /> as well as to individual movements. <br /> Congestion Management Pro g am. The CMP LOS standard for the Middlefield Road and <br /> Woodside Road intersection is LOS E or better.However, since the City of Redwood City has a more <br /> conservative LOS standard(LOS D),this intersection was analyzed based on the more stringent City <br /> of Redwood City standards. <br /> Project Trip Estimates.The magnitude of traffic produced by a new development and the <br /> locations where that traffic would appear are estimated using a three-step process: 1)trip generation, <br /> 2)trip distribution,and 3)trip assignment. In determining project trip generation,the magnitude of <br /> traffic entering and exiting the site is estimated for the AM and PM peak hours. As part of the project <br /> trip distribution,an estimate is made of the directions to and from which the project trips would <br /> travel. In the project trip assignment,the project trips are assigned to specific streets and intersections. <br /> These procedures are described below. <br /> Trip Generation. The traffic generated by the proposed school would comprise trips by staff, <br /> visitors,non-working parents,and working parents. There would be approximately 25 full-time staff <br /> members and 5 to 10 part-time staff at the site. As noted in the Traffic Study,it is estimated that 60 <br /> percent of parents would drop off students on the way to work,while the remaining 40 percent would <br /> drop off students and return home."' <br /> 110 San Mateo,County of,2013. Trac Impact Study Requirements, County of San Mateo,Department of Public <br /> Works,Roadway Services.September 1. <br /> 111 Hexagon Transportation Consultants,Inc.,2016,op.cit. <br /> P:1RWC1401B Rocketship Sch-I\PRODUCrSUS-MND1Public\Ra ketship Public Review 09-29-16.docx(09/29/16)PUBLIC REVIEW DRAFT 00 <br /> ATTY/RESO.0084/CC RESO ADOPTING CEQA-ROCKETSHIP CHARTER SCHOOL APPEAL <br /> REV:09-05-17 VR Page 96 of 124 <br />
The URL can be used to link to this page
Your browser does not support the video tag.