Laserfiche WebLink
0 <br />117 IT <br />I <br />.:.... i.�. �- .'•.� <br />011'. ,i1 r.' ,)[ 'i ;__� <br />c: �ll'G� .,i t_.-' n. ll.;'_• V� :Si':. <br />u1 -i -"rilA, ' Lt�-W, <br />c <br />That Maple Street from the edge <br />broken stone base and said con. <br />curb and gutter to be six (61 <br />hereof. <br />of the existing pavement and gut <br />Crete curb to be built and con- <br />inches across the top and twelve <br />Reference is hereby made to <br />ter on the production In astraight <br />structed at the same time as the <br />(12) Inches deep and the gutter <br />the patent license agreement of <br />l, <br />line of the westerly line of Main <br />pavement. <br />portion of said cement concrete <br />Concrete Curing Inc. dated the <br />Street northerly across said Maple I <br />There is excepted from the <br />combined curb and gutter to be <br />2nd day of December, 1929, and <br />Street southwesterly to the pro- <br />above described hydraulic cement <br />three (3) feet wide and to be six <br />now on file in the office of the <br />duction of the division line be— <br />concrete' curbs all curb now in <br />(6) inches thick next to the pave- <br />Clerk of the City of Redwood City <br />tween lots one (1) ,and two (2), <br />place which has not been ordered <br />ment and six (6) inches thick next <br />and the same is made a part <br />block six (6) Diller's Addition as I <br />removed herein and also there is <br />to the curb and said cement con- <br />hereof. <br />shown on the map thereof record -'excepted <br />from the above described <br />trete combined curb and gutter <br />ed in Book E of Maps at page <br />hydraulic cement concrete curb <br />to be built and constructed at one <br />77, records of San Mateo County, . <br />the curb on both sides of Maple <br />time, so that there shall be no <br />extended southeasterly across said <br />Street between the northeasterly <br />joint between the curb and gut - <br />Maple Street, be Improved as fol- I <br />and southwesterly right of way <br />tet; provided, however, that said <br />lows, to -wit: - - <br />lines of the Southern Pacific Rail- <br />cement concrete combined curb <br />1. That the existing concrete: <br />road Company and there is also <br />and gutter to be laid upon a base <br />curb on the northwesterly side of _excepted <br />from the above described <br />of broken stone three (3) inches <br />Maple Street between the pro- <br />hydraulic cement concrete curbs <br />thick after rolling with a cushion <br />duction northerly of the westerly <br />the concrete bridge on Maple <br />of sand one (1) inch thick be- <br />e,line <br />fineof Main Street across Maple <br />Street between the Southern Pa- <br />tween the broken stone base and <br />Street southwesterly to the north- <br />cific Railroad Company's right of <br />the hydraulic cement concrete <br />erly line of the right of way of'way <br />and Lathrop Street <br />combined curb and gutter to be <br />the Southern Pacific Railroad I <br />4. That hydraulic cement con- <br />built as herein provided. <br />Company and thirty-seven (37) <br />Crete sidewalks four (4) inches <br />That Lathrop Street in the City <br />linear feet of the existing concrete <br />thick and five (5) feet In width be <br />of Redwood City be improved by <br />curb at the southerly corner of <br />constructed on the northwesterly <br />having constructed therein one (1)'. <br />the intersection of Main Street ; <br />side of Maple Street between the <br />hydraulic cement concrete storm <br />with Maple Street and also that: <br />production in a straight line north- <br />water inlet with cast iron frame <br />eighteen (18) linear feet of the', <br />westerly of the end of the exist- <br />and grating at the end of curb <br />existing concrete curb on Maple <br />Ing gutter on Main Street south- <br />return on the southwesterly side <br />Street at the southerly corner of <br />westerly to the northeasterly right <br />of Lathrop Street at Maple Street; <br />the termination of Lathrop Street <br />of way line of the Southern Pa- <br />said storm water inlet to be gro- <br />at Maple Street be removed <br />cific Railroad Company, and from <br />.vided with a twelve (12) inch con. <br />2. That Maple Street for the full <br />the southwesterly right, of way <br />crete pipe drain thirty-two, (32) <br />width of the roadway and for the <br />line of the Southern Pacific Rail- <br />feet in length extending to the <br />length hereinbefore described in- <br />road Company to the existing side- <br />creek. <br />eluding all intersections, termina- ' <br />walk at the northeasterly side of <br />That Lathrop Street from the' <br />tions, opposite terminations or por. <br />the concrete bridge on said Maple <br />northwesterly line of the concrete' <br />tions thereof within the lines and <br />Street between the Southern Pa <br />bridge between Elm Street and <br />limits of Maple Street above de- <br />cific Railroad Company's right <br />Maple Street northwesterly to the; <br />scribed be graded and paved with <br />of way line and Lathrop Street. <br />production in a straight line of. <br />hydraulic cement concrete pave -;and <br />from the southwesterly edge <br />the southeasterly curb line of Ma- <br />ment six (6) inches thick laid <br />of the existing sidewalk at the <br />ple Street northeasterly across said ; <br />upon a base of broken stone three <br />southwesterly line of said bridge <br />Lathrop Street Including the por- <br />(3) inches thick after rolling, with <br />to the existing sidewalk at the <br />tion of termination of Lathrop, <br />a cushion of sand one (1) inch <br />production in a straight line of <br />Street and Maple Street included <br />thick laid ,between said broken <br />the division line between lots one <br />in the foregoing description, be' <br />stone base and said concrete pave- , <br />(1) and two (2), block 6, Diller's <br />improved as follows, to -wit: <br />ment; provided, however, that said�Addition <br />hereinbefore referred to <br />1. That Lathrop Street above: <br />concrete pavement shall have a ! <br />nerein. <br />mentioned for the full width of <br />thickness of eight (8) inches along <br />5. That two (2) hydraulic ce- <br />the roadway thereof and for the. <br />the centerline of said Maple Street <br />ment concrete storm water inlets <br />length herein provided be graded <br />and taper to a thickness of six (6) <br />with cast iron frames and Brat- <br />and paved with a hydraulic ce- <br />inches at points three (3) feet on <br />Ings be constructed, one (1) on <br />ment concrete pavement six (6)' <br />each side of said centerline. <br />each side of Maple Street at the <br />inches thick laid upon a base of <br />There is excepted, from the <br />southerly end of the hydraulic ce- <br />broken stone three (3) inches <br />above described pavement all that i <br />ment concrete pavement herein or. <br />thick after rolling with a cushion <br />portion of Maple Street lying be-'dered <br />constructed on said Maple <br />of sand one (1) inch thick laid: <br />tween a line two (2) feet north - <br />Street; said storm water inlets <br />between said broken stone base <br />easterly from and parallel to the <br />to be provided with a twelve (12) <br />and said concrete pavement; pro. <br />northeasterly rail of the Southern <br />inch concrete pipe drain forty <br />vided, however, that said concrete; <br />Pacific Railroad Company's tracks- <br />eight (48) feet In length, connect <br />pavement shall have a thickness! <br />and a line two (2) feet south -'!Ing <br />said inlets and to extend tr, <br />of eight (8) inches along the cen- <br />westetly from and parallel to the <br />the creek. <br />terline of the roadway of said <br />most southwesterly rail of the <br />6. That the area of the concrete <br />I:athrop Street and taper to a <br />Southern Pacific Railroad Com- I <br />bridge on Maple Street, between <br />thickness of six (6) inches at <br />pany's tracks; also there is ex- <br />the Southern Pacific Railroad <br />1 points three (3) feet on each <br />cepted from the above described <br />Company's right of way and Lath <br />Iside of said centerline. <br />pavement the area included be. <br />rop Street and between the edges <br />° 2. That hydraulic cement con- <br />tween the northeasterly and south- <br />of gutters on said bridge be paved <br />crete curbs integral with pave - <br />westerly lines of the concrete <br />with an asphaltic concrete pave• <br />ment six (6) inches across the <br />bridge on Maple Street between <br />went five (5) Inches thick at the <br />top and twelve (12) inches deep <br />the Southern Pacific Railroad <br />centerline (if street, and tapering <br />be constructed on both sides of the <br />Company's right of way and Lath- <br />to a thickness of two (2) inches <br />hereinabove described portion of <br />rop Street, <br />at edges of gutters. _ <br />Lathrop Street including all <br />Cor -3. <br />That hydraulic cement con- <br />That Maple Street in the City <br />. ners of intersections or termina- <br />crete curbs integral with the pave, <br />of Redwood City be improved by <br />tions; said hydraulic cement con- <br />ment and six (6) inches across the <br />having constructed thereon on the <br />Crete curbs to be laid upon a <br />top and twelve (12) inches deep be <br />southeasterly side 'thereof from <br />(base of broken stone three (3) <br />constructed on both sides of Ma- <br />the production in a straight line <br />Inches thick after rolling with <br />ple Street hereinbefore described <br />of the southeasterly curb line of <br />a cushion of sand one (1) inch <br />Including all corners of intersec. <br />said Maple Street northeasterly <br />thick laid between the broken <br />tions, terminations or opposite ter- <br />Across Lathrop Street and the <br />stone base and said concrete <br />minations or portions thereof with- <br />prnddclion of the dividing line, be <br />'curbs. <br />in the lines and limits of Maple <br />tween lots one and two, blocs n <br />Reference Is hereby made to the <br />Street as above described; said <br />Diller's Addition hereinbefore men <br />patent license agreement of Me - <br />hydraulic cement concrete curbs <br />tioned extended southeasterly <br />Everlast, Incorporated, dated the <br />to be laid upon a base of broken <br />across said Maple Street, a by <br />12th day of October, 1928, and <br />stone three (3) inches thick after <br />draulic cement concrete combined <br />now on file fit the office of the <br />' <br />rolling with a cushion of sand one <br />curb and gutter, the curb portion <br />Clerk of the City of Redwood <br />(1) inch thick laid between said <br />of said cement concrete combined <br />City, and the same is made a part <br />'G-I1CjI n: t,1,^ <br />_�- r.,- .0 4'. <br />to .'�.^r1,1• <br />0 <br />-.. <br />i. , . .1 tG�'Pt. ., <br />-;:1 ... i_. ... •s.• `., <br />.. _ 1'17', <br />tar <br />-a, . <br />ti .l: <br />