Laserfiche WebLink
-----Id-12----- <br />Councilman Hinman, seconded by Councilman Dusel offered the follvwing resolution And moved <br />its adoption: <br />RESOL'UT.tON ORDERING PLANS, PROrILI, AND SPECIFICATIONS N0, M-12. <br />' That Hawes street from the <br />angle of 56° 19r to the centerline <br />westerly from the southeasterly - <br />street and also"'ono" (1) cast iron <br />edge of the existing pavement at <br />thereof and the centerline of said <br />line' of Madison Avenue; thence <br />pipe six. (6) inches In diameter -and <br />the southeasterly line of Madison <br />culvert to be on the production <br />on a ,line distant five (5) feet <br />twelve (12) feet In lengtfi be pro- <br />.elvenue'to a line distant one -hun- <br />to a straight line westerly of the <br />northwesterly and parallel to the <br />vided and placed at the sewer <br />dred forty-five (145) feet south- <br />centerline of the easement through <br />southeasterly line of Madison Ave- <br />crossing under the culvert on Ne - <br />easterly and parallel to said south- <br />Block 8, New High �chool Acres; <br />nue to the southwesterly curb line <br />vada Street. <br />easterly line of Madison Avenue; <br />said abovemeuttoned four' (4) toot <br />'reinforced <br />of Nevada Street; thence, on a <br />8, That four (4), four (4) inch <br />and Myrtle Street, Nevada Street <br />by five, (5) foot ee- <br />curve across Nevada Street to a <br />vitrified salt glazed tile pipe sewer <br />and Opal Street from the south- <br />ment concrete box culvert to be <br />point distant five (5) feet south- <br />laterals -be constructed from. the <br />! easterly line of Jefferson Avenue <br />paved with an asphaltic concrete <br />westerly from the northeasterly <br />main sewer now in place along the <br />k to the northwesterly line of Mad£- <br />pavement six (6) Inches thick at the <br />line of Nevada Street; thence on <br />centerline of Street said <br />son Avenue; Quartz Street from <br />centerline thereof and one and <br />a line distant five (5) feet south - <br />.,Quartz <br />four (4), laterals to extend from <br />the edge of the present pavement <br />one-quarter (11A) inch thick at the <br />westerly from the northeasterly <br />the main sewer, to the northeaster <br />on said Quartz Street, said edge of <br />gutter lines, as more fully spawn <br />line of Nevada Strest to the south- <br />ly property,,, line of Quartz Street; <br />' pav8ment' being distant two bun- <br />on the plans, profiles, sections, de- <br />easterly line of Vera Avenue, said <br />r. <br />that twelve, (12); fou(4), tneir <br />dred seventeen (217) feet north- <br />tailed drawings and specificatlons <br />four (4) footbyfive (5) foot box <br />vitrified salt glazed tile pipe sewer <br />westerly from the northwesterly <br />referred to bereln, .and that two <br />storm water culvert tobe -carried <br />t line of Jefferson Avenue to the <br />(2) reinforced cement concrete <br />across -ail intersecting- streets on <br />laterals be constructed from the <br />northwesterly line of Jefferson <br />storm water inlets with cast iron <br />the lines hereinabove described; <br />main sewer now In place along <br />' Avenue and from the southeasterly <br />frames and gratings and twelve <br />said above mentioned storm water <br />the centerline of Madison A enue, <br />Clineof Jefferson Avenue to, the <br />(12). Inch `clrcular cement cop- <br />culvert to be provided with seven <br />said twelve (12) four (4)' inch <br />northwesterly tine of Madison Ave- <br />crate drain pipes four (4) feet <br />(7) manholes capped with cast <br />vitrified salt glazed tile pipe sewer <br />"nue;'Pearl Street from the south- <br />in length be placed In the gutters <br />iron frames and covers, in the <br />laterals be constructed from the <br />'easterly line. of Jefferson Avenue <br />on the northwesterly side of the <br />locations and of the dimensions <br />main sewer now in place along the <br />to the northwesterly line of Vera <br />reinforced cement concrete. four <br />as shown on the plans, profiles, de- <br />centerline of Madison Avenue, said <br />Avenue; Ramona Avenue from •the <br />(4) foot by five (5) foot box cul- <br />tailed drawings end specifications; <br />twelve (12) laterals to extend from <br />.southeasterly line of Vera Avenue <br />vert and connected thereto, or- <br />twelve (12) inch cement concrete <br />the main sewer to the southeaster - <br />to, the ,edge of the existing pave- <br />dered hereinabove to be built on <br />circular storm water pipe culverts <br />ly property line of Madison Ave- <br />ment, on said Ramona Avenue, said <br />Ruby Street, further that Ruby <br />provided with reinforced cement <br />nue. That four (4), four (4) Inch <br />edge 'of pavement being distant <br />Street between the edges of the <br />concrete storm water inlets and <br />vitrified salt glazed the pipe sewer <br />two hundred fifty (250) feet south- <br />existing pavement between the <br />capped with east iron frames and <br />laterals be .constructed from the <br />easterly from the, soutbeasterly <br />northerly and lines of <br />gratings to be built at the ,loca- <br />main sewer now in place along <br />line of 'Vera Avenue; Madison Ave- <br />„southerly <br />the easements through BIocks 8 <br />tions Indicated as follows: One <br />the centerline of Nevada Street, <br />nue from the edge of the exist- <br />and 9, New High School Acres, <br />such twelve (12) inch culvert to <br />said four (4) laterals to extend <br />Ing pavement at the southwesterly <br />produced across Ruby.Street and <br />be built at the northwesterly curb <br />from the main sewer to the north - <br />line of Hawes Street to a line dia- <br />between the - northwesterly and <br />line of Jefferson Avenue and con- <br />easterly ;property line of Nevada <br />tent five (5) feet southwesterly <br />southeasterly edges of the tour <br />neat to the four (4) foot by five <br />Street. All of the above men - <br />from and parallel to the south- <br />(4) foot by five •(5) toot reln- <br />(5) foot box culvert; One,, such <br />tioned four (4) inch laterals. to be <br />w-steriv line of Quartz Street; <br />forced cement concrete box cul—twelve <br />(12) inch ,culvert' to be <br />connected to their respective main <br />Vera Avenue from -a line distant <br />vert herein ordered to be built on <br />built at the southeasterly property <br />sewers at the Wyss from which <br />five (5) feet southwesterly from <br />Ruby Street, be paved wltb%,an <br />line of Jefferson Avenue and con- <br />the existing laterals, at these lova- <br />and parallel to the southwesterly <br />- asphaltic concrete pavement two <br />neat to the four (4) foot by five <br />tions are to he removed. <br />line of Itamona Avenue produced <br />and one-half (2%) inches in thick- <br />(5) foot box culvert; One such <br />There is however excepted from <br />in , a straight line northwesterly <br />ness with an asphaltic conerete�tvyslva. <br />(12) inch culvert to be <br />cement concrete pavement and <br />across Vera Avenue to a line dig-'wearingthe <br />surface one and one-half <br />built at the northwesterly prop- <br />integral curb hereinbefore ordered <br />tent Svc (5) feet northeasterly <br />(I 'A) inches In thickness laid there <br />arty line of Madison Avenue across <br />to be built on Ramona Avenue <br />- from and parallel to the north-: <br />line of Pearl Street pro- <br />• on, provided said asphaltic con-. <br />Quartz Street; One such twelve <br />twelve (12) feet at the location <br />easterly <br />duced In a straight line south -;or <br />crate pavement be laid upon a base <br />. (12) inch culvert to be , built at <br />of the bridge to be built thereon <br />easterly across Vara Avenue; Ave <br />cushion of broken stone three- <br />• (3) inches in thickness after roll-• <br />the southwesterly property lin¢ <br />Pearl, Opal and Nevada, Streets <br />as more fully shown on the plans,] <br />nue def Ora from the edge of the <br />• in also that cement concrete °ons <br />g, <br />• °f <br />Madison Avenue sad con - <br />profiles, detailed drawings and' <br />existing 'pavement at the north- <br />' bined Curb and gutter be built <br />across <br />. <br />neat to the four (4) foot by five <br />specifications. <br />westerly' line of Jefferson Avenue <br />(from the ends of the existing <br />box culvert to be built <br />The City will pay out of Its 1930 <br />to a line distant six hundred. <br />concrete combined curb <br />(5) foot <br />the 'southeasterly side of Madi- <br />bond fund the sum of Seven Thou - <br />twenty-five (625) feet northwest <br />.cement <br />and gutter sy w in place) between <br />and <br />on <br />son Avenue as beretn • ordered to <br />sand (;7,000) Dollars towards, the <br />from said edge o1 pavement <br />g <br />the norther] and southerly lines <br />' - <br />be bisalt. <br />costs of the improvements de - <br />along the centerline of Avenue del <br />n <br />of the easement through Blocks &- <br />the timber bridge on <br />scribed herein In paragraphs num- <br />Ora; Union Place from the edge <br />: and 9, New ' High School Acres, <br />5, That <br />Avenue lying twenty-five <br />bared 3, 4 5, 6,,7 and..8� , .a <br />Y ___. _. - c—. <br />of the existing pavement at the <br />southerly, line of the Heteh-Heteby <br />produced across Ruby Street, the <br />- curb portion of said cement con-:. <br />Jefferson <br />(25) feet northeasterly from the ' <br />Aqueduct right-of-way to the <br />southerly line Avenue del Ora, <br />crate <br />combined curb and gutter to <br />northeasterly property line of <br />Street be removed and the <br />of <br />be six (6) Inches across the, top <br />Quartz <br />Including all Intersections and ter- <br />� and eleven (11) inches deep and <br />opening' filled in, and a cement <br />minationa - and portions thereof <br />isbltbin <br />the gutter portion of said cement <br />concrete pavement, with integral <br />in <br />the above descrlbed limits_ <br />concrete combined curb and gutter' <br />curb' to match' that already <br />be improved as follows, to -wit: <br />to be twenty-four (24) Inches wide <br />- place on both sides of the timber <br />1 That .the above mentioned <br />and to be six and one-quarter <br />bridge be built of the thickness <br />and described streets, avenues and <br />(611) inches thick next to the <br />and nature of the existing pave - <br />portions thereof be graded for <br />pavement and five (5) inches thick <br />went and curb and all as shown <br />their full widths and far the <br />next to the curb, said cement con- <br />on plans, profiles and detailed <br />lengths ber£nbefore,mentioned and <br />crete combined curb, and gutter <br />drawings referred to herein; also <br />that the roadwaya thereof be <br />to be laid ulbn a base or cushion <br />that a strip of the existing cement <br />paved with a cement concrete <br />ofbroken stone three (3) inches <br />concrete pavement twelve (12) feet <br />pavement five (5) inches In thick- <br />In thickness after rolling, <br />in `width between a line distant <br />,.ness laid upon a base or cushion <br />of broken stone three (3) inches <br />4, That a reinforced cement con - <br />two t2) feet southwesterly from <br />'parallel <br />in, thickness after rolling with a <br />Crete four (4) foot by five (5) <br />and to ; the northeasterly <br />curb fine of Quartz Street and a <br />cusblon of sand one (1) inch in <br />foot box storm water culvert with <br />line twelve (12) feet northeasterly <br />thickness laid between said broken <br />manholes :capped with cast iron <br />therefrom be removed to build the <br />stone base and said cement con- <br />pavement, provided, however, <br />frames and covers and reinforced <br />four (4) foot by five (5) foot box <br />.state <br />that said cement concrete pave- <br />Cement concrete storm water In- <br />culvert, said pavement to be re <br />placed upon the completlon of the <br />ment shall have a thickness . of <br />lets, capped with cast £rosy frames <br />Culvert <br />seven (7) inches along the center- <br />and gratings and provided with <br />g, That a channel of the section <br />line thereof and aloe the center <br />g <br />twelve (12) inch circular pipe <br />. <br />and dimensions shownron the plans <br />line of all Intersecting streets and <br />storm water drains of the sizes, <br />be excavated through Block 8, New <br />taper to a thickness of five. (5) <br />dimensions and number and In the <br />High School Acres within the lines <br />Inches at points three (3) feet on <br />particular locations and positions <br />_ <br />of the right of way, through said, <br />each side of said centerlines. <br />and of the materials as are more <br />Block 8, New'High School Acres; <br />2. That Integral cement concrete <br />fully ahotivss, described and set <br />the four {4) toot five foot <br />curbs be constructed on both sides <br />forth on the plans, profiles, de- <br />box storm water culvert <br />of the. streets and avenues and <br />portions <br />portions thereof hereinbefore de- <br />tailed drawings and specifications <br />cand all <br />an <br />storm waterit inlets are to be re- <br />and within the above de- <br />referred, to herein, shall be con- <br />structed, In, along and upon the <br />Enforced with steel on <br />sed <br />scribed limits and also upon the <br />following -streets and Avenues, to- <br />the pians, et draw - <br />dens <br />corners of all intersecting and <br />wit:. Said relnfoiced cement con- <br />specifices, <br />togs end specifications referred <br />p r ed <br />terminating streets and avenues <br />trete four (4) foot by five. (5) <br />to herein, <br />and portions thereof within the <br />toot box,storm water culvert one <br />7. That the existing sewers along <br />!Ines hereinbefore mentioned and <br />thousand,- eight hundred thirteen <br />the centerlines of Ruby Street,i <br />deseribed'and said cement concrete <br />(1,813) feet long to commence at <br />Quartz Street and Madison Ave <br />.curbs integral with the pavement <br />the Intersection of the southwest- <br />nue be lowered as shown on the <br />shall be six t8) Inches across the <br />erly property line of Quartz Street <br />plans, profiles, detailed drawingsil <br />top and eleven (11) inches deep, <br />with the centerilne of the ease- <br />and specifications to accammodatek <br />said integral curb to be ,laid upon <br />ment through Block 8, New High <br />the four (4) foot by five (5) foot <br />a base or cushion of broken stone <br />School Acres, and to run thence <br />box storm water culvert herein - <br />three (3) Inched In thickness after <br />as shown on the plane, across <br />before ordered, ,and that one (1) <br />rolling with a cushion of sand <br />'(1) <br />Quartz Street to a point five (5) <br />cent iron pipe eight (8) Inches int <br />one ,inch do thickness laid be- <br />-broken <br />feet southwesterly from the north-' <br />diameter and twelve (12) feet In <br />tween said stone base and <br />easterly line of Quartz Street; <br />length be provided and placed at' <br />said, integral curb to be built as <br />thence on a line distant five (5) <br />the sewer crossing - under said <br />herein provided. <br />feet southwesterly and parallel to <br />culvert on Madison Avenue, and: <br />3. That Ruby Street be Improved <br />the northeasterly tine of Quartz <br />one (1) cast iron pipe six (6) <br />by having a four (4) foot by five <br />Street to the northwest curb line <br />inches in diameter and twelve (12) <br />(5) foot reinforced cement'eonerete <br />of Madison Avenue; thence on a <br />feet In length be provided and <br />box culvert 80,08 feet long and iyingcurve <br />across Madison Avenue. to a <br />placed at the sewer crossing under <br />across said Ruby Street at an point distant five (5) fest north- <br />the culvert to be built' on Ruby) <br />71 <br />to <br />ass <br />to <br />