Laserfiche WebLink
259 <br />Passed and adopted by the Council of the City of Redwood City at <br />a regular meeting thereof, held on the 21st day of July, 1930, by the <br />following vote: <br />Ayes and in favor of the passage of the foregoing Resolution, <br />Councilmen: H. A. Beeger, W. J. Dusel, C. J. Hildebrant, E. B. Hinman, <br />G. W. McNulty, D. R. Stafford. <br />Noes and against the passage of the foregoing Resolution, <br />Councilmen: NODE. <br />Absent: Councilmen: P. A. MC Carthy. <br />DANIEL R. STAFFORD <br />Mayor of the City of Redwood City <br />Attest: <br />B. E. MYERS <br />Cleric of the City of Redwood City <br />1930. I hereby approve the foregoing Resolution this 21st day of Judy, <br />DANIEL R. STAFFORD <br />Mayor of the City of Redwood City <br />After presentation of the Plans, Profiles and Specifications by the City Engineer <br />they were adopted by resolution offered by Councilman McNulty, seconded by <br />Councilman Iiildebrant, as follows: <br />RESOLUTION ADOPTING PLANS; PROFILES AND SPECIFICAT101-IS NO. M-12. <br />RESOLVED by the Council of the City of Redwood City, County of <br />San Maateo, State of California, that the plans, profiles, detailed draw- <br />ings and specifications for doing the following work and making the folloly- <br />ing improvements in said City, to -crit: <br />fromof`utherlthe <br />hewawesexistingepav at <br />existingthe <br />angle of 'S8°`-19�ta'the centerline"'.p duce'd aceo"ss"Ruby"Cltreat; tno" <br />edge m nt <br />line of the Retch-Hetch'pav¢ment'"at <br />soy y <br />thereof and the centerline of'said� <br />curb dcement <br />oto <br />the southeasterly line of Madison <br />Aqueduct right-of-way to ttit <br />culvert to be on the production(; <br />crate combined curb andgutter <br />Avenue to a line distant one hun- <br />southerly line of Avenue del Ora, <br />in a straight line westerly of the' be six (6) inches across the top <br />Bred forty-five (145) feet south- <br />including all Intersections and ter- <br />centerline of the easement through' and eleven 't11} inches deep and <br />[easterly and parallel to said south- <br />ie line <br />sminations and portions thereof <br />the described limits <br />Block 8, ,New High School, Acres; the gutter portion of said cement <br />and Sof Madison Street 'within above <br />be Improved as follows, to-wit, <br />said abovementioned four (4) foot 'concrete .combined curb and gutter <br />by <br />ayd Opal Street from the south- <br />I 1. That the above mentioned <br />,five ..(5) foot reinforced ce-' -to be twenty-four (24) Inches, wide <br />meat concrete box culvert to be <br />easterly line of Jefferson Avenue <br />Ito <br />Viand described streets, avenues and <br />;and to 'ba six and one-quarter <br />paved with an asphaltic concrete°(6y/a) tnch¢e thick next to the <br />the northwesterly line of Wadi- ,portions thereof be graded for <br />,pavement six (6) Inches thick at the and five (5) Inches thick <br />[son ,Avenue; Quartz Street from ;their full widths and for the <br />lengths herlubefore mentioned and <br />presentpavementaid <br />centerline thereof and one and next to the curb, said cement con- <br />one-quarter (11/4) Inch thick atthe�crete <br />' said Quartz Street, c nt <br />g that 'the roadways thereof be <br />combined curb and gutter <br />mutter lines, as more fuliy'shown to be laid upon a base or cushion <br />,pavement being .dtstant two bun- paved with a cement "concrete <br />�on the plans, profiles, sections, dem !of broken three (8) Inches <br />dred seventeen (217) Peet north- pavement five (5) Inches In thick- <br />stone <br />4tailed drawings and specifications Illi, thickness after roiling. <br />westerly from the northwesterly nese laid .upon a base or'cushlon <br />referred to herein, and that two'! <br />line of Jefferson Avenue to the of broken stone three (3) Inches <br />�(2) reinforced cement concrete 4. That a reinforced cement coin' <br />itorthwesterly line Of J¢Yferson !n thickness after roiling with a <br />storm water inlets with cast "iron }trete four (4) foot by five (B)_ <br />Avenue and from the southeasterly ?cushion of sand one (1) inch In <br />,frames and gratings. and twelve toot box storm water culvert with <br />line of Jefferson Avenue to the Ulckness laid between said broken <br />(12) inch circular-, cement con- 'manholes ca ped with .cast Iron <br />p <br />northwesterly line of Madison Ave- 'atone base and said cement con- <br />nue: Pearl Street from the south- trete pavement, provided, however, <br />,crate - drain pipes four (4) feet frames and covers and �relnforced <br />easterly line, of Jefferson Avenue !that said cement concrete pave- <br />3n length be placed In the gutt¢rm cement concrete, storm water !n - <br />to the northwesterly line of Vera 'ment shall have a thickness of <br />(seven <br />on the northwesterly aide of the' <br />reinforced cement concrete four 'lets, capped with cast Iron frames <br />Avenue: Ramona Avenue from the (7) laches along the center- <br />southeasterly line of Vera Avenue [line thereof and along the ¢snide- <br />(4) foot by five (5) foot box cul- and gratings and provided with <br />to the edge of the exlst(ng pave- line of all intersecting streets and <br />vert and connected thereto, or- twelve (12) .)nch circular pipe <br />dared hereinabove to be built on `storm water drains of the sizes, <br />went on said Ramona Avenue, said taper to a thickness of five (5) <br />Ruby Street,, further that Ruby dimensions and number and In the <br />edge of pavement being distant inches at points three (3) feet on <br />Street between the edges of the locations and positions <br />two hundred fifty (250) feet south- each side of said centerlines. <br />,parttcular <br />existing pavement between the: of the materials as are more <br />easterly from the southeasterly 2. That Integralcementconcrete <br />northerly and southerly ]Ines of ,fully shown,, described and met <br />tine of Vera Avenue; Madison Ave- curbs be constructed on both skies <br />the easements through Blocks, 8 forth on the plans, profiley,+ de- <br />nue from the edge of the exist of the streets and avenues. and <br />, <br />and 9, New High 'School Aeras, tailed drawing's and specifications <br />ing pavement at the southwesterly' portions thereof hereinbefore de-, <br />produced across Ruby Street and referred to Herein, shall be con- <br />tine of Hawes Street to a line dis- scribed and within the above de- <br />the northwesterly and 'strutted In, along and upon the <br />tent <br />tont find feet southwesterly corneribed limits and also upon the <br />southeasterly edges of the four following streets and avenues, to - <br />pa <br />from and parallel to the truth -,!corners of all Intersecting and <br />(4) foot by five (5) foot rein- wit: Said reinforced cement con - <br />Verarlv line rf Quartz Street;,an terminating streets and avenues <br />forced cement concrete box cul-�, trete four (4) foot ,by five (5)` <br />Vera Avenue horn a line difromt and portions thereof within the <br />vert herein ordered to be built an Soot box storm water culvert one <br />five (5) feet southwesterly from dines, hereinbefore mentioned and <br />and parsllel to the southwesterly described and said cement concrete <br />Ruby Street, be paved with an thousand eight hundred thirteen <br />line. of Ramona Avenue produced curbs Integral with the pavement <br />asphaltic concrete pavement two (1,813) feet long to commence at <br />and one-half (21A) Inches in thick. the intersection at the southwest- <br />outhwestacross <br />In a straight line northwesterly shall be eta' (6) Inches across the <br />acrossVera Avenue`to wiles dis- top and eleven (11) Inches deep, <br />naps with an asphaltic concrete erlq property line of Quartz Street <br />tant five (5) feet northeasterly said Integral curb to be laid upon <br />wearing surface one and one-half with the centerline of the ease - <br />(134) Inches In thickness laid there- ment through Block 8, New High <br />from and parallel to the north- a base or cushion of broken stone <br />easterly line of Pearl Street pro- three°(3) Inches In thickness after <br />provided said asphaltic can- School Acres, and to run thence <br />jou; <br />duced in a straight line south- rolling 'with a cushion of sand <br />trete pavement be laid upon a base as "shown, on the plans across <br />Street to <br />easterly across Vera Avenue; Ave- one (1) inch In thickness laid be- <br />or cushion of broken stone three Quartz a point five (5) <br />Inches in thickness feet southwesterly from the north - <br />nue del Ora from the edge of, the tween said lbroken atone base and �(3) <br />existing pavement at, the north- said integral curb to be built as <br />after roll- <br />Ing' also that cement concrete core- easterly , line of Quartz Street; <br />westerly line of Jefferson Avenue herein provided. <br />bind curb and gutter be built thence on a line distant five (5) <br />feet southwesterly and parallel to <br />to a line distant nix hundred 3. That Ruby Str6et be improved <br />land <br />(frotri the ands. tfie existing <br />rt <br />the northeasterly line of Quartz <br />line <br />twenty-five (625) feet northwest- by having a four (4) foot by five <br />cement concrete combined curb <br />Stre¢t thsterly <br />St line' <br />srly from said edge of pavement (5) Loot reinforced cement concrete l <br />Hong'the of Avenue del box culvert 60.08 feet <br />gutteoncrer now in lace) between! curb <br />the northerly and southerly lines) Madison Avenue;. thence b on .a <br />therly a <br />centerline long and lyingsof <br />bra v Union Place from the edge across said Ruby Street <br />the through Blocks 6I curve across venue; Avenue to a <br />at as <br />` <br />and 9. New Eilsh Sehnnt Acres. 4 lminf dlataat, five (5) feet north- <br />