|
IJ
<br />0
<br />,
<br />t
<br />0
<br />0
<br />,
<br />;existing pavement between the'
<br />concrete pavement twelve (12) feet
<br />shown and described on the plane,
<br />northerly and -southerly lines of
<br />in width between a line distant
<br />profiles, detailed drawings and
<br />the easements through Blocks 8
<br />two (2) feet southwesterly from
<br />specifications adopted by the Coun-
<br />and. 9, New High School Acres,
<br />and parallel to' the northeasterly
<br />cil of the City of Redwood City
<br />produced across .Ruby Stereet and
<br />curb llne� of Quartz Street and a
<br />on the 21st day of July, 1930, and
<br />between the northwesterly and
<br />line twelve (12). feet northeasterly
<br />now on file in the office of the
<br />I
<br />southeasterly edges of the four
<br />therefrom be removed to build the
<br />Clerk of Said City, to which plans,
<br />i •
<br />(4) foot by five (5) toot rein-
<br />four, (4) foot by five (5) foot box
<br />profiles, detailed drawings and
<br />forced cement concrete box cul-
<br />culvert, said pavement to be .re-
<br />specifications reference is hereby
<br />vert herein ordered 'to be built on
<br />placed upon the completion of* the
<br />made for a, complete description
<br />_
<br />That Hawes street from tue
<br />nuby Street, be paved with an
<br />culvert. -
<br />and location of said work and im- '
<br />edge of the existing pavement at
<br />asphaltic concrete pavement two
<br />6. That a channel of the section
<br />provements and for further par -
<br />the southeasterly line of Madison
<br />and one-half (2%) inches in thick-
<br />and dimensions shown on the plans
<br />titulars, and the same are made
<br />Avenue to a line distant one hun-
<br />ness with an asphaltic concrete
<br />be excavated through Block 8,.NeW
<br />a part hereof. .
<br />dred forty-five (145) feet south-
<br />wearing surface one, and one-half
<br />High School Acres within the lines
<br />And the Council of the City of
<br />easterly and parallel to said south-
<br />(1iE),Inches in thickness laid there •
<br />of the right of way, through said
<br />Redwood City does hereby determ-
<br />L
<br />easterly line of Madison Avenue;
<br />on, provided said asphaltic con-
<br />Block 8. New High School Acres;.ine
<br />and declare that the foregoing
<br />and Myrtle Street, Nevada Street
<br />trete pavement be laid upon a base
<br />the four (4) foot by five .(5) foot
<br />described work,and improvements
<br />and Opal -Street from the south-
<br />or cushion of b.oken stone three
<br />box storm water culvert and all
<br />are of more than local or, ordinary '
<br />easterly line of Jefferson Avenue
<br />(3) inches in thickness after roll-
<br />storm water inlets are to be re-
<br />public benefit and will affect and
<br />Ao the northwesterly line .of Madi-
<br />Ing, also tLat cement concrete com-
<br />infdreed with steel as shown on
<br />benefit the lands and district
<br />son Avenue; Quartz Street from
<br />bined curb and gutter be built
<br />the plans, profiles, detailed draw-
<br />hereinafter mentioned, which said
<br />" the edge of the present pavement
<br />(from the ends of the existing
<br />ings and specifications referred
<br />district is hereby declared to be
<br />on-sald Quartz Street, said edge of
<br />cement concrete combined- curb
<br />to herein.
<br />the district benefited by said work
<br />pavement being distant two hun-
<br />and gutter now in place) between
<br />lines
<br />7 That the existing sewers along
<br />and improvements; that therefore
<br />dred seventeen (217) feet north-
<br />the northerly and southerly
<br />the centerlines of Rub Street,
<br />the entire costs and expenses of
<br />westerly from the, northwesterly
<br />of the easement through Blocks 8
<br />Quartz Street and Madison Ave-
<br />d
<br />said work and Improvements shall -
<br />line of Jefferson Avenue to the
<br />and 9, New High School Acreb,
<br />nue be lowered shown on the
<br />be and are hereby made charge-
<br />' _ northwesterly line of Jefferson
<br />produced across, Ruby Street, the
<br />'
<br />plans, profiles, detailed drawings
<br />g
<br />able against and shall be assessed
<br />'upon
<br />Avenue, and from the southeasterly,
<br />curb •portion of sp cement con-
<br />and specifications to accommodate
<br />, said lands and .distrtc t+
<br />line of Jefferson Avenue to 'the
<br />Crete combined curb and gutter to
<br />the four (4) foot b five (5) foot:
<br />'which district is within the lim-
<br />northwesterly line of Madison Ave-
<br />be nix ( inches across .the top
<br />'inches
<br />box storm water culvert herein-
<br />its of the City of Redwood City,
<br />nue; Pearl Street from the south-
<br />and eleven (11) deep and
<br />_
<br />County Of San Mateo, Stats of of
<br />easterly line of Jefferson Avenue
<br />the gutter portion of said cement
<br />before ordered, and that one (1)
<br />California, and said district Is de -
<br />to the northwesterly, line of Vera
<br />concrete combined curb and gutter
<br />cast iron pipe eight. (8) inches In
<br />diameter
<br />scribed and shown on a certain
<br />j Avenue; Ramona Avenue from the
<br />to be twenty-four (24) inches wide
<br />and twelve (12) feet , In'"
<br />map or plat entitled "Map 'Show -
<br />southeasterly line of Vera Avenue
<br />and to be Six and one-quarter
<br />and placed at
<br />the
<br />Ing Assessment District under
<br />to the edge of the existing pave-
<br />(614) inches thick 'next to the
<br />- sewer erprovide n g .under said
<br />Resolution of Intention, No. M-12;'
<br />ment on said Ramona Avenue, said,
<br />pavement and five (5) inches thick
<br />culvert on Madison Avenue, and
<br />which map or plat was adopted
<br />edge of, pavement being distant
<br />next to the curb, said cement con=
<br />one (1) cast iron pipe six (6)
<br />and approved by tha Council -of,
<br />two hundred fifty (250) feet South-
<br />creta combined curb and gutter
<br />Inches in diameter and twelve (12) .
<br />the City of Redwood City on the
<br />•,: easterly from the southeasterly
<br />to be laid upon a base or cushion
<br />feet in length be .provided and
<br />21st day of July, 1930, and which
<br />line of Vera Avenue; Madison Ave-
<br />of broken stone three (3)- Inches
<br />placed at the sewer crossing under
<br />map or plat is now on -file In the
<br />nue from the edge of the exist-
<br />In thickness after rolling. -
<br />the culvert to be built on Ruby
<br />,office of the Clerk of said
<br />Ing pavement at the southwesterly
<br />• 4. That a reinforced cement con-
<br />street and also one (1) cast iron
<br />,City
<br />of Redwood Clty% and to which
<br />line of Hawes Street to a line dis=
<br />crate four '(4) foot by five (5)
<br />.Pipe six (6) inches In diameter and
<br />map or plat reference is hereby
<br />Cant five (5) feet southwesterly
<br />foot box storm water culvert with
<br />twelve (12) feet In length be pro-
<br />madefor an accurate and com-
<br />1 from and parallel to the south -manholes
<br />capped with cast iron
<br />vlded and placed at the sewer
<br />plete description and location of
<br />westerly line of Quartz Street;
<br />frames and, covers and reinforced
<br />crossing under the culvert on Ne-
<br />said assessment, district and the
<br />Vera Avenue from a line distant
<br />cement concrete storm water In.
<br />vada Street.
<br />same is made a part hereof; p^o-.
<br />five (5) feet southwesterly from
<br />lets, capped with. cast iron frames
<br />8. That four (4), four (4) inch
<br />sided.
<br />, however, that all streets
<br />and parallel to 'the. southwesterly
<br />and gratings and provided with
<br />vitrified salt glazed tale pipe sewer
<br />and avenues 'or portions thereof
<br />line of Ramona Avenue produced
<br />twelve (12) Inch circular pipe
<br />laterals be constructed from the
<br />''Included within, said assessment
<br />- in a straight line northwesterly
<br />storm water drains of the sizes,,
<br />main sewer now In place along the
<br />district and shown on the map
<br />across Vera Avenue. to a line dis-
<br />dimensions and number and In the
<br />centerline of Quartz Street said
<br />thereof shall be omitted from any
<br />tant five (5) feet northeasterly
<br />particular locations and positions
<br />four (4) laterals to extend from
<br />assessment levied for the costs and
<br />from and . parallel to the north-
<br />and of the materials. as are more
<br />the main sewer to the northeaster-
<br />expenses of the work afyresaid,
<br />easterly line of Pearl Street pro-
<br />fully shown, described and set
<br />ly property line of Quartz Street;
<br />said streets and avenues and porr,
<br />duced in a straight line south-
<br />forth on the plans,' profiles, de-
<br />that twelve (12), four (4) inch
<br />tions thereof now being in public
<br />easterly across Vera Avenue; Ave-
<br />tailed drawings and specifications
<br />vitrified salt glazed 'tile pipe sewer
<br />use as public streets, and avenues,
<br />nue del Ora from the edge of the
<br />referred to herein, Z ail be con-
<br />laterals be constructed from the
<br />There is hereby excepted from
<br />existing pavement at the north-
<br />strutted in, along and upon the
<br />main sewer now in place along
<br />the work and Improvements afore.
<br />westerly line of Jefferson Avenue
<br />'
<br />following streets and avenues, to-
<br />the centerline of Madison Avenue,
<br />said any thereof that Is already
<br />to a line distant six hundred
<br />wit: Said reinforced cement con-
<br />said twelve (12) four (4) inch
<br />done to the lines and grades
<br />twenty-five (625) feet northwest-
<br />trete four (4) 'foot by five (5)vitrified
<br />salt glazed tale pipe sewer
<br />as
<br />shown on the plans, profiles, de-
<br />erly from said edge of pavement
<br />foot box storm water culvert one
<br />laterals be constructed from the
<br />tailed drawings and specifications
<br />along the centerline of Avenue dal
<br />thousand eight hundred thirteen
<br />.main sewer now in place along the
<br />herein referred to..
<br />-Ora; Union Place from the edge
<br />'at
<br />(1,813) feet long td commence at
<br />centerline of Madison Avenue, said
<br />NOTICE IS HEREBY GIVEN
<br />of the existing pavement the
<br />the intersection of the southwest-
<br />twelve (12) laterals to extend from
<br />that serial bonds to represent un,
<br />southerly line of the Hetch-Hetchy
<br />erly property line of Quartz Street
<br />the main sewer to the southeaster-
<br />paid assessments and bear interest
<br />Aqueduct right-of-way to the
<br />with the centerline of the- ease-
<br />ly,property line ofMadison Ave-
<br />at the rate of seven (7) Per cent
<br />Southerly line of Avenue del Ora;
<br />ment through Block 8, NewHigh
<br />nue.That four (4), four (4) Inch
<br />Per annum shall be Issued here•
<br />Including all intersections and ter-
<br />School Acres, and to run thence
<br />vitrified salt glazed file pipe sewer
<br />under in the manner provided by
<br />i minations and portions .thereof
<br />as shown. on the plans across
<br />laterals be constructed from
<br />Improvement Bond Act of 1915
<br />within the above described limits
<br />Quartz Street to a, point five (6)
<br />the
<br />.the
<br />of the State -Of California, as
<br />be improved as follows, to -wit:
<br />feet southwesterly from the north-
<br />main sewer now in place' along
<br />amended, the last Installment
<br />1. That the above mentioned
<br />easterly line of Quartz Street;
<br />the centerline of Nevada Street
<br />of
<br />which bonds shall mature be
<br />and described streets, avenues and
<br />thence on a line distant flue .(5).
<br />said four (4) laterals to extend
<br />and
<br />payable nine (9)' years' from ttie
<br />vortions thereof be eraded for
<br />foet_gm tb eate_rly 'and narall 1 0
<br />from the main sewer to the 4o_T.W,-
<br />:second day Of July next
<br />succeed-
<br />ing ten (10) months from their.
<br />-
<br />date. Except as herein provided
<br />for -the issuance of serial bonds
<br />the work and Improvements here-
<br />in' described shall be done and
<br />_
<br />made' pursuant to the provisions
<br />-
<br />-
<br />of the 'Improvement Act of 19.11
<br />-
<br />of the State of California, as,
<br />i
<br />@
<br />-
<br />amended and now in effect.
<br />IJ
<br />0
<br />,
<br />t
<br />0
<br />0
<br />,
<br />0
<br />,
<br />t
<br />0
<br />0
<br />,
<br />
|