Laserfiche WebLink
346 <br />1 - 8" All Bell Tee....................$14.70 each - $14.70 <br />6 - 8x6 All Bell Tees .................. 13.50 if - 81.00 <br />4 - 8x4 All Bell Tees .................. 12.75 if - 51:00 <br />5 - 6" All Bell Tees ................... 10.00 it - 50.00 <br />TOTAL FOR PIPE & FITTINGS ---- $6685.70 <br />The prices given above are f.o.b. cars at Redwood City, California. <br />The other bidders were: <br />Grinnell Company $9,024:85 <br />U.S. Pipe & Foundry Cc 60685.70 <br />American Cast Iron Pipe Co 6,772:70 <br />Pacific States Cast Iron Pipe Cc 7,021.70 gill <br />The City Manager also submitted the bids for the extension of Warwick Street and recommended <br />that the contract be awarded to W. 0. Tyson at his price of $6,631.80, itemized below, <br />and the contract was so awarded, on motion of Councilman Beeger, seconded by Councilman <br />Dusel. <br />WAWICK STREET EXTENSION. <br />ITEM 1.- For the removal of all eucalyptus trees within the limits <br />of work, the stun of ONE DOLLAR ($1.00) Dollars for the complete <br />removal of said trees. <br />ITEI,I 2.- For constructing complete, SIX (6) inch vitrified pipe <br />i <br />sanitary sewer, the sum of SEVENTY CENTS ($0.70) Dollars <br />per linear foot. <br />ITEU 3.- For constructing complete, FOUR (4) inch vitrified pipe <br />sanitary sewer, the sum of SIXTY CENTS ($0.60) Dollars <br />per linear foot. <br />ITEM 4.- For constructing complete, EIGHTEEN (18) inch concrete <br />pipe sewer, the sum of ONE DOLLAR SEVENTY FIVE CENTS ($1.75) <br />Dollars per linear foot. <br />ITEM 5.- For constructing complete, the concrete CATCH -BASINS, with <br />cast iron frames and grating, along the line of the 18 <br />inch storm server, tho sum of FIFTY DOLLARS ($50.00) <br />Dollars for each catchbasin. <br />ITEM 6.- For constructing BRICK MANHOLES, with cast iron framos and <br />j <br />covers, the sum of FIFTY EIGHT DOLLARS ($58.00) Dollars for <br />p <br />each manhole. <br />ITEM 7.- For rebuilding BRICK MANHOLES, as indicated on the plans <br />r <br />the sum of, .FIFTY FIVE DOLLARS ($55.00) Dollars each. <br />ITEM 8.- For all GRADING -CUTTING, the sum of iVPENTY FIVE CENTS ($0.25) <br />Dollars per Cubic Yard. <br />ITW 9.- For all GRADING -FILLING, the sum of TWENTY FIVE CENTS ($0.25) <br />Dollars per Cubic Yard. <br />ITEM 10. -For constructing cement concrete COMBINED CURB & GUTTER, <br />the sum of SEVENTY FIVE CENTS ($0.75) Dollars per linear foot. <br />ITEM 11. -For constructing ASPHALTIC IWADAY PAVMMI;T, the sum of <br />771ELVE CENTS (x.12) Cents per Square Foot. <br />ITEM 12. -For constructing CEMENT CONCRETE PAVE,12NT, five inches (5) <br />in thickness, the sum of NINETEEN CEI;TS Cents per <br />Square Foot. <br />ITEM 13. -For constructing cement concrete CURB integral with the <br />pavement, the sum of FORTY FIVE CENTS ($0.45) Cents per <br />linear foot. <br />ITEM 14. -For constructing cement concrete SIDI3YALK, four inches (4) <br />,1 <br />in thiclmess, the sum of SIXTEEN CENTS (00.16) cents per <br />I■tai <br />square foot. <br />Name of Bidder W. 0. TYSON <br />Business Address BOX 491 <br />Redwood City. <br />The other bidders were: t <br />Western Paving Company $6,827.10 <br />W. A. Dontanville 7,592.48 <br />