Laserfiche WebLink
50 <br />MINUTES OF REGULAR MEETING <br />REDWOOD CITY COUNCIL <br />DECEMBER 41 1933 <br />5:00 P.M. <br />Upon roll call, the following Councilmen were present: Mayor, W. J. Dasel, H. A. Beeger, C. J. <br />Hildebrant, R. N. Jones, C. G. Lambert, Paul A. McCarthy. City Clerk, B. E. Myers. <br />Absent: Geo. W. McNulty. <br />The minutes of the meeting of November 20 were approved on motion of Councilman McCarthy, seconded <br />by Councilman Lambert. <br />A second letter from Col. John H. Skaggs, District Engineer, was read in which he asked for action <br />on that certain resolution applying to highways through Redwood City. The City Manager was <br />18structed to get in touch with Col. Skaggs and arrange for a reply at a later date. <br />Affidavit showing publication of the call for bids on the Emerald Lake project was ordered filed. <br />On this date, in the office of'the City Manager, seven bids were opened for the construction <br />of the million gallon reservoir and installation of a cast iron pipe line and the City <br />Manager filed a written recommendation that the award be made in favor of W. J. Tobin of Oak- <br />land who bid $19,696.78 as follows: <br />FOR CONSTRUCTION OF RESERVOIR. <br />ITEM 1. - For all GRADING-FJCCAVATION, the sum of Sixty Cents ($0.60) per cubic yard. <br />ITEM 2. - For all GRADING-EMBANHIdENT, the. sum of Thirty Cents ($0.30) per cubic yard. <br />ITEM 3. - For GRADING -TOP SOIL, consisting of removing top soil as directed at <br />beginning of work, stock -piling same outside the lines of the work, and - <br />later rehandling and spreading same over embanlonent slopes, for this <br />work complete and in place, the sum of Thirty Cents ($0.30) per cubic <br />yard. <br />ITEM 4. - For all "GUNITE" in the lining of reservoir, including the column footings, <br />the top curb and base therefor, all steel reinforcement, and all incidental <br />work, the sum of Twenty-six Dollars ($26.00) per cubic yard. <br />ITEM 5. - For all "GUNITE" in gutters around outside wall of reservoir, including <br />steel Peinforcement and all incidental work, the sum of Twenty-four Dollars <br />and 50/100 ($24.50) per cubic yard. <br />ITEM 6. - For all "GUNITE" in columns above footings, including steel reinforcement <br />and all incidental work, the sum of Thirty-seven Dollars ($37.00) per <br />cubic yard. <br />ITEM 7. - For the ROOF complete, including all incidental work and materials required <br />therefor, the sum of Thirty-eight Hundred Dollars ($3,800.00). <br />ITEM 8. - For all Eight (8) inch vitrified clay sewer pipe in place complete, the <br />sum of One Dollar ($1.00) per lineal foot. <br />FOR CAST IRON PIPE LINE. <br />ITEM 9. - For all Eight (8) inch CAST IRON PIPE, including trenching, laying of pipe, <br />back -filling, tamping, furnishing of all material and equipment (EXCEPTING <br />fittings and valves), and all incidental work, the sum of One Dollar and <br />Thirty Cents ($1.30) per lineal foot of pipe. <br />ITEM 10.- For 132 lineal feet of six (6) inch cast iron pipe, including all fittings <br />and valves, as shown on the plan of reservoir and to be constructed as an <br />outlet from reservoir, the total sum of Two Hundred Eighteen and 28/100 <br />($218.28) <br />ITEM 11.- For all CAST IRON FITTINGS, including tees, crosses, wyes, bonds, plugs, <br />double bell and pipes, but excepting those already included in ITEM 10 <br />which 6 inch outlet pipe from reservoir, the sum of Six Cents ($0.06) per <br />pound. <br />I <br />E <br />1 <br />I <br />