Laserfiche WebLink
037 = <br />4 <br />AND BE IT FURTHER RESOLVED that the width of the,sidewalks <br />hereinbefore mentioned are to be and are as shown on the plans, <br />profiles and detailed drawings adopted by this resolution. <br />Passed and adopted by the Council of the City of Redwood <br />City at a regular meeting thereof held on the 20th day of Octo- <br />ber, 1941, by the following vote: <br />Ayes and in favor of the passage of the foregoing resolution: <br />Councilmen'L.*C. Christensen, E. A. Fletcher, F. D. Granger, <br />G. W. McNulty, VT. M. Werder, H.. F. Anderson. <br />Noes and, against the passage of the foregoing resolution: <br />Councilmen None <br />Absent: Councilmen H. W. Edmonds. <br />H. F. ANDERSON <br />Mayor of the City of Redwood City <br />Attest: <br />C. W. ELTRINGHAM <br />Clerk of the City of Redwood City <br />I hereby approve the foregoing resolution this 20th, day of <br />October, 1941. <br />H. F. ANDERSON <br />Mayor of the City of Redwood City' <br />On motion of Councilman Fletcher, seconded by Councilman Christensen, <br />the following resolution was unanimously adopted: <br />°RESOLUTION OF INTENTION 140. 1941-3 <br />RESOLVED by.,the Council of the City of Redwood City that in <br />the opinion of said Council the public interest and convenience <br />require and that it is the intention of said Council to order the <br />following -work to be done and improvements to be made in said <br />City of Redwood. City, to -wit: <br />That the northeasterly side of E1 Camino Real between Man- <br />zanita Street and Charter Street and also the southwesterly side <br />of said El Camino Real between Lincoln Avenue and Center Street <br />be improved by being graded and having constructed thereon and <br />therein cement concrete sidewalks four (4) inches thick and five <br />(5) feet wide, said sidewalks to be laid upon a base m4bushion of <br />sand at least two (2) inches in thickness and of the full width of <br />said sidewalks; and that'cement concrete combined curbs and gutters <br />be constructed within the limits above described on'both sides of <br />El Camino Real. <br />There is hereby excepted from the hereinbefore described <br />work and improvements any parts thereof that is already done to <br />the line and grade as shown on the plans; profiles and specifi- <br />cations mentioned herein. <br />The width of the sidewalks hereinbefore mentioned are to be <br />and are as shown on the plans, profiles and detailed drawings here- <br />in after referred to herein. <br />All the work provided for herein shall be done and made to <br />the grades, as shown on the plans, profiles and detailed drawings, <br />which grades are hereby adopted as the official grades for said <br />work and improvements, and reference is hereby made to the plans, <br />profiles and detailed drawings for a description of the grades at <br />which said work is to be done and said improvements made and the <br />same are made a part hereof. <br />All the hereinbefore and hereinabove mentioned and described <br />work and improvements are to be done and made at the locations and <br />4 <br />II . <br />l <br />LI <br />4 <br />