Laserfiche WebLink
A lengthy discussion followed in regard to an agreement between the city of Redwood <br />City and the Rensthgton Square Seger District. City Manager explained that the <br />Kensington Square Sever District had been formed covering 79 'lots. The residentF <br />of that district were at present using septic to mks and such health conditions <br />existed that the County was forcing them to put in sewers. It would be neces- <br />sary to connect 'with the Jefferson Avenue and James Avenue sewers. The sanitary <br />district would pay the cost of these connections and also the cost of extending <br />two laterals on Sapphire and Ruby Streets to connect the Jefferson Avenue sewer <br />with the Vera Avenue Sewer and the district would pay the city 50¢ per month or <br />06y.00 per year for each service connected in the sanitary district, the collec- <br />tion of the assessments would be made by the County and the district would draw <br />warrants in favor 'of the City and remit semi-annually after the taxes are col- <br />lected. One of our post-war plans is a sewage disposal plant and it is provided <br />in the agreement that the Sanitary District would have to pay their portion of <br />the cost. Councilman Fletcher asked if our present sewer system could stand the <br />load, to ulhich City Manager Mead replied -that it would. Councilman Hilton asked <br />if a survey had been made.. City Manager Mead replied that a survey had been <br />made by the City Engineering Department. <br />Mr. Carbine slpok# from the floor and asked where the sewer was located. <br />On being told by the City Manager that it was about 50 feet from the intersec- <br />tion of Jefferson Avenue inside of the City limits, Mr. Carbine was of the opin- <br />ion that the sewer could not carry the load. Mr. Mead asked Mr. Carbine the <br />basis for this statement "to which Mr. Carbine replied that during rainy weather <br />- the sewer overflowed at the manholes. City Manager Mead explained that this <br />overflow was due to storm water getting into the sewer and that the sanitary <br />sewers were not intended to carry storm water drainage. City Attorney McCarthy <br />explained that the plan of construction will relieve overcrowding on the Jeffer- <br />son Avenue sewer. Councilman Armstrong asked if there was any need for rushing <br />the matter. City Manager Mead explained that the sanitary district had already, <br />received bids on the work and that they had not contacted him until after this <br />had been done. Councilman Armstrong stated that from information submitted he. <br />was unable to form an opinion and didn't want to do anything that would act <br />againsts the interests of the citizens .of Redwood City. City Manager Mead replied <br />that the capacity of the sewers had been checked and that both the Vera Avenue ar.d <br />Jefferson Avenue sewers are adequate to take on the increased load that would <br />be put 'on them. <br />Councilman McNulty asked what condition the Vera Avenue sewer was in, <br />stating that there had always been a great, deal of trouble with this sewer. <br />City Manager Mead replied that there had been no trouble since he had been here., <br />Mayor Granger ®tated that the Council had gone on record to accept Mr. Willie <br />Frost as a consulting engineer until a city engineer was appointed and asked if <br />Mr. Frost had been engaged. City Manager Mead said lie did not know of any such <br />agreement and that Mr. Frost had not been contacted. He felt the city engineer - <br />Ing department was capable of making the survey. Street Superintendent Winter <br />addressed the Council stating that the Vera Avenue sewer had never given any <br />trouble during the summer months. In the winter, storm water ran into the sewer, <br />• but there was no doubt in his mind but that the mains could carry the extra load. <br />10 <br />