with Jefferson Avenue to a culvert at the intersection with Madison, complete1 7
<br />with manholes and all necessary appurtenant structures; by constructing therein
<br />one (1) standard catch basin connected by a 12" reinforced concrete pipe storm
<br />drain to be constructed opposite Lot 4, Block 9, Kensington Square, by construc-
<br />ting therein an 18" reinforeced concrete pipe storm drain extension at the inter-
<br />section of said street and Jefferson Avenue.
<br />(b) The improvement of Crompton Road by constructing therein an 811 vitrified clay
<br />sanitary sewer main from the intersection with Dover Road to a point opposite
<br />the southerly limit of Lot 13, Block 13, Kensington Square, complete with all
<br />necessary wyes, laterals, manholes, lampholes and all other structures appur-
<br />tenant thereto; by constructing therein an extension of the present 301, corru-
<br />gated metal pipe culvert across said street opposite Lot 5, Block 13, Kensington
<br />Square and by constructing at either end thereof reinforced concrete head walls
<br />with hand rails; by constructing therein a catch basin opposite Lot 1, Block 13,
<br />Kensington Square, connected by a 12" reinforced concrete pipe leading to a
<br />catch basin to be constructed on Dover Road opposite Lot 10, Block 10, Kensing-
<br />ton Square.
<br />(c), The improvement of Oak Ridge Drive by constructing therein a 61' vitrified clay
<br />' sanitary sewer main from a point therein opposite Lot 5, Block S, Kensington
<br />' Square, to the intersection with Devon Way, and an 81' vitrified clay sanitary
<br />sewer main from the intersection with Devon Way to Dover Road, with all necessary
<br />wyes, laterals, manholes, lampholes and all other structures appurtenant thereto;
<br />by constructing therein an 15" reinforced concrete pipe storm sewer main from
<br />the intersection with Jefferson to a point opposite Lot 7, Block S, Kensington
<br />Square; by constructing therein two (2) catch basins, one each on either side
<br />of the said street opposite Lot 14, Block 6, Kensington Square, and a catch
<br />basin at the corner of Lot 6, Block 7, Kensington Square; all of which are to
<br />be. connected by a 10" reinforced concrete pipe storm drain, together'with man-
<br />holes and other appurtenant structures.
<br />(d) The improvement of Windsor Way by constructing therein a 611 vitrified clay
<br />sanitary sewer main from the intersection with Madison Avenue to a point therein
<br />opposite Lot 5, Block 18, Kensington Square, and a 6" vitrified clay sanitary
<br />sewer main from a point therein opposite Lot 7, Block 15, Kensington Square,
<br />to the intersection with Vera, together with wyes, manholes, laterals, lampholes
<br />and all other appurtenant structures; by constructing therein a 551, by 361,
<br />corrugated metal pipe arch culvert from a point opposite Lot 4, Block 71
<br />Kensington Square, to a point opposite Lot 5, Block 18, Kensington Square, with
<br />a catch basin at either end thereof and reinforced concrete head walls with
<br />hand rails at either end thereof.
<br />(e) The improvement of Lancaster Way by constructing therein a 6" vitrified clay
<br />sanitary sewer main from a point therein opposite Lot 5, Block 9, Kensington
<br />E ' Square to the intersection with Dover Road, together with manholes, lampholes,
<br />laterals, wyes and other appurtenant structures; by constructing therein a 121,
<br />reinforced concrete pipe storm sewer main from the intersection with Jefferson
<br />to a point opposite Lot 4, Block S, Kensington Square, together with manholes
<br />and other appurtenant structures; by constructing therein one (1) catch basin
<br />each on either side of said street, connected with a l0" reinforced concrete
<br />pipe storm drain opposite Lot 4, Block S, Kensington Square.
<br />(f) The improvement of Devon Way by constructing therein an S" vitrified clay sewer
<br />main from a point therein opposite Lot 1, Block 7, Kensinton Square to the inter-
<br />section with Oak Ridge Drive and a 6" vitrified clay sanitary sewer main in an
<br />easement along the easterly, northerly and northwesterly line of Lot 9, Block 6,
<br />Kensington Square, together with manholes, wyes, laterals, lampholes and other
<br />appurtenant structrues; by constructing therein a catch basin opposite Lot 61
<br />Block 7, Kensington Square.
<br />II (g) The improvement of Wessex Way by constructing therein a 611 vitrified clay
<br />,• sanitary sewer main from a•point therein opposite Lot 1, Block 11, Kensington
<br />Square to the intersection with Upton, together with wyes, manholes, lampholes,
<br />laterals and other appurtenant structures.
<br />I' •(h) The improvement of Dover Road by constructing therein an Su vitrified clay sani-
<br />tary sewer main from the intersection with Crompton Road to the intersection
<br />with Alameda de las Pulgas, together with wyes, manholes, lampholes, laterals
<br />and other appurtenant structures.
<br />i (i) The improvement of Upton by constructing therein a 6" vitrified clay sanitary
<br />(' sewer main from a point opposite Lot 5, Block 10, Kensington Square to the
<br />intersection with Wessex May, and a 6" vitrified clay sanitary sewer main from
<br />the intersection with Vera to the intersection with Madison, and an S° vitrified
<br />clay sanitary sewer main from the intersection Wessex Way to the intersection
<br />j with Madison, together with all manholes, lampholes, wyes, laterals and other
<br />�j appurtenant structures; by constructing therein a 15° reinforced concrete pipe
<br />I'. siphon with catch basins at either end thereof from a point opposite Lot 7,
<br />I Block 11, Kensington Square to a point opposite Lot 13, Block 10, Kensington
<br />Square, and a 15" reinforced concrete pipe siphon with catch basins at either
<br />end thereof from a oint opposite Lot 17, Block 11, Kensington Square, to a
<br />point opposite Lot �, Block 15, Kensington Square.
<br />(j) The improvement of Madison by constructing therein an S° vitrified clay sani-
<br />tary sewer main from the intersection with Alameda de las Pulgas to a point
<br />therein opposite the northerly line of Lot 11, Block 12, Kensington Square,
<br />together with wyes, manholes, lampholes, laterals and other appurtenant struc-
<br />tures.
<br />(k) The improvement of Jefferson by constructing therein an extension of an existing
<br />1511 and 30" corrugated metal pipe to a catch basin to be constructed opposite
<br />.r Lot 2, Block 7, Kensington Square;. by constructing therein a 10" reinforced
<br />i � Ef
<br />
|