Laserfiche WebLink
-Marshall job could not be started this ear" instead of 'Broadway job". Counci <br />n yloran Herkner <br />I <br />Broadway <br />moved approval with corrections, seconded by Councilman Jones and carried. <br />{� <br />I <br />?',i <br />�, <br />- CIRCLE ROAD IMPROVEMENTS. Affidavits of publication, posting• and mailing were ordered <br />PUBLIC HEARING <br />filed by the Mayor. Those who appeared and discussed the improvements were W. A. Saunders, 189 Circle <br />} f <br />a <br />goad, Mr.. Krogh, Mrs. Hopkins, 112 Circle Rogd, and several others spoke. Most of those present were <br />in favor of 'the work beginning this fall provided they could be assured it wouldn►t drag out into <br />the winter months. The contract stipulated that the work would be done in 30 working days. Although <br />there was a penalty clause attached of $50 per day and the City could rightfullycollect it, this <br />! <br />would be of no benefit to the residents if they were inconvenienced by rains. A steel strike or atpr <br />it <br />strike or any strike affecting materials needed could aloes u ro rens of the ob <br />p progress job. Also it was to be <br />I;+I <br />considered work could not begin directly after rains until proper condition of the ground. One bid <br />was submitted. If this was opened and awarded, the earliest date that the work could be started would <br />be on September list, but not later than September 15th, the choice was up to the contractor. Acting <br />Mayor Morgan thought the work should be finished at the very latest by the middle of November. City <br />Engineer stated one thing should be clear, the contractor could not be made to spread redrock if he r <br />i <br />can't continue the work and just gets the grade completed a couple of days before it rains. Even if <br />the present bid might be high, there was the possibility that later bids might be 10% or 15% higher <br />'� <br />it <br />111' <br />11, <br />in the spring. It was evident the Council could not be committed to statements of which conditions <br />, i <br />l;jl• <br />q¢Jt <br />I <br />�i <br />ti <br />beyond their control and Acting Mayor Morgan asked the people if they would be reasonable with the <br />Ic <br />"' <br />Council and contractor if the rains came. A vote was taken on whether or not to start work now, 6 <br />were in favor, 8 were opposed. A total of 24 notices to property owners had been mailed, the vote <br />was 14 out of the 24. All shallow laid sewer laterals would have to be lowered and it was not known <br />how many there were to be so lowered. City Engineer's estimate on the bob was $21,152. Three sets of <br />plans were sent out, but only one bid came in. Councilman Granger moved that protests be overruled, <br />seconded by Councilman Royer and carried. <br />.. �. <br />I LjRESOLUTION <br />llll. ORDERING WORK DONE CIRCLE ROAD IMPROVEMENTS was offered and moved for adoption by Councilman <br />Jones, seconded by Councilman Herkner and carried on roll calla Councilman Spillers and Mayor Britschgi <br />it <br />noted absent. <br />P <br />Affidavits of publication and posting of notice calling for sealed bids were ordered filed by Acting <br />Mayor Morgans <br />BID FROM DOUGLASS & WOODHOUSE, P. 0. BOX 908, STANDISH STREET, REDWOOD CITY was opened. Amount of bid was <br />$25,604.10. City Engineer was to check bid and report back later in the meeting. <br />by Poole and wife. Map was also submitted and parcels of property noted as "A" and "B" in ocks <br />4 and 5, Di Addition. "A" - 62.88 frontage on Middlefield Road and 100 ft. paralle th City <br />property was apprais on a basis of $500 per front foot, or $31,440 for the en Is property. 11B" <br />I; °a.' <br />'I, <br />directly behind the City Fire use and Parcel "A", was appraised on a is of $1.00 per sq.. ft., or <br />{(. <br />!�. <br />$12,527 total. Office buildings on " - Poole Transfer and Ja son's Music House, has been appraised <br />�; <br />;;� <br />. <br />'` <br />at a replacement value of 10 00. They felt t the should be allowed 1500 for the covering fo <br />the creek which is a portion of this parcel* s o"and "B", plus reconstruction of building <br />j,!''('; <br />amounts to $54,467, less allowance for stringante as their <br />the creek of $1 leaves a net balance <br />,t <br />;,, <br />,.! <br />I :' <br />j', <br />final appraisal of 2 6 . Pa ernes and <br />$5 ,9 7 were based on current selling prices similar prop <br />the building at today's roduction cost. This seemed to be in accordance with t the Chief had in <br />mind. Counci oyer read report and adked that City Clerk send copy of appraisal and o oamuttee's <br />r 1 <br />recotmne tion, including trap to each emember of the Council for their study prior to approval' T <br />�?Daci-.graph; iswte» September 4th, 1951 minutes - a mtas <br />approval of August 20th u <br />with correction thqt above parabe deleted. <br />