-Marshall job could not be started this ear" instead of 'Broadway job". Counci
<br />n yloran Herkner
<br />I
<br />Broadway
<br />moved approval with corrections, seconded by Councilman Jones and carried.
<br />{�
<br />I
<br />?',i
<br />�,
<br />- CIRCLE ROAD IMPROVEMENTS. Affidavits of publication, posting• and mailing were ordered
<br />PUBLIC HEARING
<br />filed by the Mayor. Those who appeared and discussed the improvements were W. A. Saunders, 189 Circle
<br />} f
<br />a
<br />goad, Mr.. Krogh, Mrs. Hopkins, 112 Circle Rogd, and several others spoke. Most of those present were
<br />in favor of 'the work beginning this fall provided they could be assured it wouldn►t drag out into
<br />the winter months. The contract stipulated that the work would be done in 30 working days. Although
<br />there was a penalty clause attached of $50 per day and the City could rightfullycollect it, this
<br />!
<br />would be of no benefit to the residents if they were inconvenienced by rains. A steel strike or atpr
<br />it
<br />strike or any strike affecting materials needed could aloes u ro rens of the ob
<br />p progress job. Also it was to be
<br />I;+I
<br />considered work could not begin directly after rains until proper condition of the ground. One bid
<br />was submitted. If this was opened and awarded, the earliest date that the work could be started would
<br />be on September list, but not later than September 15th, the choice was up to the contractor. Acting
<br />Mayor Morgan thought the work should be finished at the very latest by the middle of November. City
<br />Engineer stated one thing should be clear, the contractor could not be made to spread redrock if he r
<br />i
<br />can't continue the work and just gets the grade completed a couple of days before it rains. Even if
<br />the present bid might be high, there was the possibility that later bids might be 10% or 15% higher
<br />'�
<br />it
<br />111'
<br />11,
<br />in the spring. It was evident the Council could not be committed to statements of which conditions
<br />, i
<br />l;jl•
<br />q¢Jt
<br />I
<br />�i
<br />ti
<br />beyond their control and Acting Mayor Morgan asked the people if they would be reasonable with the
<br />Ic
<br />"'
<br />Council and contractor if the rains came. A vote was taken on whether or not to start work now, 6
<br />were in favor, 8 were opposed. A total of 24 notices to property owners had been mailed, the vote
<br />was 14 out of the 24. All shallow laid sewer laterals would have to be lowered and it was not known
<br />how many there were to be so lowered. City Engineer's estimate on the bob was $21,152. Three sets of
<br />plans were sent out, but only one bid came in. Councilman Granger moved that protests be overruled,
<br />seconded by Councilman Royer and carried.
<br />.. �.
<br />I LjRESOLUTION
<br />llll. ORDERING WORK DONE CIRCLE ROAD IMPROVEMENTS was offered and moved for adoption by Councilman
<br />Jones, seconded by Councilman Herkner and carried on roll calla Councilman Spillers and Mayor Britschgi
<br />it
<br />noted absent.
<br />P
<br />Affidavits of publication and posting of notice calling for sealed bids were ordered filed by Acting
<br />Mayor Morgans
<br />BID FROM DOUGLASS & WOODHOUSE, P. 0. BOX 908, STANDISH STREET, REDWOOD CITY was opened. Amount of bid was
<br />$25,604.10. City Engineer was to check bid and report back later in the meeting.
<br />by Poole and wife. Map was also submitted and parcels of property noted as "A" and "B" in ocks
<br />4 and 5, Di Addition. "A" - 62.88 frontage on Middlefield Road and 100 ft. paralle th City
<br />property was apprais on a basis of $500 per front foot, or $31,440 for the en Is property. 11B"
<br />I; °a.'
<br />'I,
<br />directly behind the City Fire use and Parcel "A", was appraised on a is of $1.00 per sq.. ft., or
<br />{(.
<br />!�.
<br />$12,527 total. Office buildings on " - Poole Transfer and Ja son's Music House, has been appraised
<br />�;
<br />;;�
<br />.
<br />'`
<br />at a replacement value of 10 00. They felt t the should be allowed 1500 for the covering fo
<br />the creek which is a portion of this parcel* s o"and "B", plus reconstruction of building
<br />j,!''(';
<br />amounts to $54,467, less allowance for stringante as their
<br />the creek of $1 leaves a net balance
<br />,t
<br />;,,
<br />,.!
<br />I :'
<br />j',
<br />final appraisal of 2 6 . Pa ernes and
<br />$5 ,9 7 were based on current selling prices similar prop
<br />the building at today's roduction cost. This seemed to be in accordance with t the Chief had in
<br />mind. Counci oyer read report and adked that City Clerk send copy of appraisal and o oamuttee's
<br />r 1
<br />recotmne tion, including trap to each emember of the Council for their study prior to approval' T
<br />�?Daci-.graph; iswte» September 4th, 1951 minutes - a mtas
<br />approval of August 20th u
<br />with correction thqt above parabe deleted.