Laserfiche WebLink
<br /> <br /> <br /> SCOPE OF WORK, cont. <br /> <br /> <br /> B. Preparation of the Notice of Preparation and Initial Study <br /> DJP&A will prepare the EIR Notice of Preparation (NOP), in accordance with the CEQA and City of <br /> Redwood City Guidelines. The NOP will include an explanation of why the City of Redwood City <br /> has elected to prepare an EIR. The NOP will include a brief project description and overview of the <br /> anticipated environmental impacts of the proposed project. An electronic copy of the NOP will be <br /> provided to the City, who will circulate the document to appropriate local and regional agencies. We <br /> will incorporate any relevant comments received on the NOP within the 30-day circulation period into <br /> ' the Administrative Draft EIR. <br /> ~ An Initial Study will be completed with an environmental checklist to focus the EIR on effects and <br /> issues that are determined to be significant for the project and project site, (CEQA Guidelines Section <br /> ~ The Initial Study can be circulated with the NOP and/or be appended to the Draft EIR. <br /> C. Preparation of the Administrative Draft EIR <br /> ~ DJP&A will prepare an Administrative Draft EIR (ADEIR). The ADEIR will focus on the potentially <br /> significant environmental impacts associated with the project. DJP&A will submit up to copies of <br /> ~ the ADEIR to the City for review and comment (this scope assumes that the City will provide copies <br /> to Sequoia Hospital for their review, if desired). An electronic version of the ADEIR, in WORD, will <br /> be provided to the staff, so that they may insert comments via the "track changes" mode. The specific <br /> ~ sections of the ADEIR are described below. <br /> Preface <br /> ~ The EIR will include a preface explaining why an EIR is being prepared for the project and <br /> summarizing the uses of the EIR. <br /> ~ EIR Summarv <br /> <br /> ~ The EIR will include a summary section consisring of a concise description of the proposed project, a <br /> brief narrative outlining the project's environmental impacts, and proposed or recommended <br /> mitigation measures. The summary will also describe the areas of public controversy and the <br /> ~ alternatives to the project. <br /> Proiect Descriution <br /> ~ The EIR will describe the proposed hospital renovation and expansion project, based upon <br /> information provided to DJP&A by the City and Sequoia Hospital. It is our understanding that the <br /> ~ project proposes renovations and expansion of the existing Sequoia Hospital at its 11-acre campus <br /> located at Alameda de las Pulgas. Upon completion, the expanded hospital will include <br /> hospital beds, square feet of hospital space with a new central plant to serve the expansion <br /> ~ area, square feet of new medical office, and a five-leve1632-space parking structure, for <br /> net new parking spaces. The project proposes seismic retrofitting of the existing hospital, in <br /> conformance with SB and renovation of approximately square feet of the existing <br /> ~ hospital. No helipad or helicopters flights in/out of the site are proposed by the project. The project <br /> Seguoia Hospital Campus Project/Precise Plan EIR Scope of Services <br /> ~ David J. Powers & Associates, Inc. Page 6