My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 W L Butler Construction
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 W L Butler Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:02 PM
Creation date
5/13/2002 9:40:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
W L Butler Construction
PROJECT NAME
design & construction Fire Station 11
RMP File Number
304
Date
4/23/1999
Reso Ref
13602 13783 13818
MO Ref
01-28 01-50
Box
5900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Division of Industrial Safety of the State of California, the plan shall be prepared and signed by <br />a registered civil or structural engineer: Nothing in this requirement shall be deemed to allow <br />the use of shoring, sloping, or protective systems less effective than that required by the <br />Construction Safety Order. Nothing in this requirement shall be construed to impose tort liability <br />on the City Or any of its employees. <br /> <br /> e. Nothing in this Agreement shall be construed to permit work not <br /> <br />conforming to the latest edition of the aforementioned codes, laws, regulations, and standards. <br /> <br /> f. Any material or workmanship specified by reference to the number, <br /> <br />symbol, or title of a specific standard, such as a Commercial Standard, a Federal Specification, <br />a Trade Association Standard, or other similar standards, shall comply with the requirements in <br />the latest revision thereof, and any amendments or supplements thereto, in effect on the date of <br />the application for the building permit, except as limited to type, class or grade, or modification <br />in such reference. The standard referred to, except as otherwise specifically modified herein, <br />shall have full force and effect as though printed in the Contract Documents or attached thereto. <br /> <br /> g. It is required that materials, products, processes, equipment, or the like <br /> <br />be installed or applied in accordance with the manufacturers' instructions, directions, or <br />specifications, or words to this effect, unless otherwise noted. Said application or installation <br />shall be in strict accordance with the printed instructions furnished by the manufacturer of the <br />material concerned, for use under conditions similar to those at the Project site. <br /> <br /> h. The DB shall furnish, at no additional cost to the City, any additional labor <br /> <br />and/or materials when required by the compliance with the codes, laws, regulations, and <br />standards, though the additional labor and/or materials are not mentioned in this Agreement. <br /> <br />Agmt-247 <br />F/sWsWRC/Council <br /> <br />FXS:rg <br />03/29/99R;04/05/99R, 04/07/99R <br /> -10- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.