My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 W L Butler Construction
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 W L Butler Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:53:02 PM
Creation date
5/13/2002 9:40:26 AM
Metadata
Fields
Template:
Agreement
Contractor Name
W L Butler Construction
PROJECT NAME
design & construction Fire Station 11
RMP File Number
304
Date
4/23/1999
Reso Ref
13602 13783 13818
MO Ref
01-28 01-50
Box
5900
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Redwood City ~.sign-Builder Selection <br /> <br /> procurement. Include the City of Redwood City's occupancy requirements <br /> showing portions of the Project having occupancy priority and with <br /> ongoing operational occupancy requirements. <br /> <br /> 2.3 Project Construction Budget. Prepare a project budget as soon as <br /> major project requirements have been identified, and update periodically <br /> for approval by the City of Redwood City. Prepare an estimate based on a <br /> quantity survey of drawings and specifications at the end of the schematic <br /> phase and design development phase for approval as the City of <br /> Redwood City's project construction budget. Update and refine this <br /> estimate for approval by the City of Redwood City as the development of <br /> the drawings and specifications proceeds, and advise the City of Redwood <br /> City if it appears that the project construction budget will not be met and <br /> make recommendations for corrective action. <br /> <br /> 2.3.1 In partnership with the City of Redwood City's Project Manager, <br /> establish and implement a bid process to establish the guaranteed <br /> maximum price prior to the start of construction. The current <br /> construction estimate is $1.85 million. <br /> <br /> 2.3.2 Establish a mutually agreed upon construction contingency which is <br /> under the control of the City of Redwood City and is included in the <br /> guaranteed maximum price. <br /> <br /> 2.3.3 Develop a system for budgetary controls during construction. <br /> <br /> 2.4 Construction Planning/Bidding. Prepare bid packages for multiple <br /> subcontractors to insure delivery by the required dates. <br /> <br /> 2.4.1 Make recommendations to the City of Redwood City's Project <br /> Manager regarding the division of work in the drawings and <br /> specifications to facilitate the bidding and awarding of trade <br /> contracts, allowing for phased construction taking into consideration <br /> such factors as time of performance, availability of labor, <br /> overlapping trade jurisdictions, and provisions for temporary <br /> facilities. <br /> 2.4.2 Review the drawings and specifications to eliminate areas of <br /> conflict and overlapping in the work to be performed by the various <br /> trade contractors. <br /> <br /> 2.4.3 Develop a subcontractor pre-qualification process similar to the <br /> Design-Builder (D-B) Selection Process as working drawings and <br /> specifications are completed. Upon Design-Builder's review and <br /> completion of the contract documents and after approval by City of <br /> Redwood City, D-B shall put the project out for competitive bids to <br /> <br />C:~back456~wkgfls~99010~FP Page 21 of 32 <br />3/09/99 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.