My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt01 Wagstaff and Associates
RedwoodCity
>
City Clerk
>
Agreements
>
2000-2009
>
2001
>
Agmt01 Wagstaff and Associates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2014 4:07:25 PM
Creation date
5/13/2002 10:14:57 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Wagstaff and Associates
PROJECT NAME
EIR for Marian Shores Village
RMP File Number
304
Date
11/20/2001
MO Ref
01-161
Task Order
Yes
Box
6600
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wagstaff and Associates Contract Exhibit "A" <br /> City of Redwood City Bait Island Road Development EIR <br /> October 25, 2001 Page 11--10 <br /> <br /> r (11) Blomquist Street Extension/East Bayshore Road and Bair Island Road* <br /> r (12) Maple Street and Veterans Boulevard* <br /> r (13) Maple Street and Blomquist Street (two intersections)* <br /> r (14) Blomquist Street and Seaport Boulevard* <br /> r (15) Blomquist Street/East Bayshore Road and Seaport Boulevard* <br /> <br /> r In addition, freeway segments along US 101 will also be evaluated. The key freeway <br /> r segments to be analyzed are: <br /> <br /> r (1) US 101, Redwood Shores Parkway/Holly Street to Whipple Avenue (northbound and <br /> r southbound), <br /> <br /> r (2) US 101, Whipple Avenue to Woodside Road/Seaport Boulevard (northbound and <br /> r southbound), and <br /> <br /> r (3) US 101, Woodside Road/Seaport Boulevard to Marsh Road/Bayfront Expressway <br /> r (northbound and southbound). <br /> <br /> Traffic Analysis Assumptions. The follOWing assumptions have been applied by Fehr & Peers <br /> in the preparation of this EIR work scope and budget estimate: <br /> <br /> · City staff will review the work scope and any changes will be made prior to Fehr & Peers <br /> Associates beginning work; <br /> <br /> · City staff will provide a list of approved and planned developments in the project area <br /> and vicinity for use in the cumulative traffic and circulation analysis; <br /> <br /> · Wagstaff and Associates, in consultation with City staff, will provide the necessary <br /> quantitative project description and breakdowns (residential units and types, commercial <br /> square footages and types) for the consolidated "project" at buildout; <br /> <br /> · Available data from previous traffic studies will be obtained, including from the existing <br /> movie theater complex and recent traffic counts for the relevant segments of US 101; <br /> and <br /> <br /> · Anticipated traffic volumes from approved (but not yet constructed) developments will be <br /> provided by City staff, as will estimated occupancies for the existing residential units on <br /> the Bair Island Road project site, and relevant information on funded near-term roadway <br /> improvements. <br /> <br /> 1. Data Collection/Field Reconnaissance. The physical characteristics of the Bair Island <br /> Road project site and the surrounding roadway network will be reviewed during a site visit to <br /> identify existing roadway cross-sections, intersection lane configurations, traffic control <br /> devices, surrounding land uses, and the locations of pedestrian, bicycle, and transit facilities. <br /> <br />r *Designates intersections which require analysis with the Blomquist Street E~ension <br /> <br /> wP $11622~M ISC~O013-2.EXA <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.