My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 Beals Group, The
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 Beals Group, The
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:28:35 PM
Creation date
4/19/2005 11:13:07 AM
Metadata
Fields
Template:
Agreement
Contractor Name
Beals Group, The
PROJECT NAME
Redwood City school fields
RMP File Number
304
Date
7/8/1999
Reso Ref
13617
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />E. <br /> <br />5. <br /> <br />c) Final Redline and Review Quality Control (QC). <br />d) Submittal Preparation and coordination. Submit one set of reproducibles <br />to City for bid packaging. <br />Project Administration <br /> <br />Construction Services <br />Following the completion and approval of the construction documents, we propose the <br />following construction administration services: <br />1. Bidding Phase <br />a) Kick-off meeting with City Staff, the City Construction Manager (CCM), <br />and the beals group, inc. This meeting will firm-up the roles and <br />responsibilities of each person and provide protocols and processes to <br />follow during construction. <br />Coordinate and Administer Bidding <br />1) Contact potential bidders <br />2) Attend site-walk pre-bid meeting <br />3) Coordinate and respond to contractor questions during the bid <br />period <br />4) Preparation of addendum as necessary <br />5) Attend bid opening <br />6) Assist the City in reviewing and analyzing the bids <br />Project Administration <br />a) Construction Phase <br />b) Pre-Construction <br />1) Attend pre-construction meeting <br />2) Attend site-walk meeting <br />3) Work with City on turf spraying and other pre-construction needs <br />Construction Administration <br />a) "Regular" observation and review will be provided, considering weather <br />and construction practice. For purposes of this proposal regular is semi- <br />weekly. <br />1) Meet and site walk with the contractor. Meeting Report will be <br />provided. <br />2) File an observation report for each "regular" observation visit. <br />Semi-weekly site meetings will be facilitated by the beals group, inc. <br />which will include the contractor, City Staff, and the CCM. <br />Prepare agenda <br />Facilitate meeting <br /> <br />b) <br /> <br />2. <br /> <br />3. <br /> <br />b) <br /> <br />c) <br />d) <br /> <br />J:\ProposaIsIP99\P99-06 RWCity School RenovationsIP-Scope-4-16-99 ,doc <br /> <br />5 <br /> <br />"""'- ,.., '.""".-'---P--'I""-.""""" <br />
The URL can be used to link to this page
Your browser does not support the video tag.