Laserfiche WebLink
<br />3.2 Field Surveys and Mapping. Field surveys shall consist of updating Caltrans digital <br />photogrammetric mapping, supplemented with field topography for determination of <br />accurate elevations at conforms, and critical right-of-way or other controls. Specifically, <br />the detailed survey information shall be prepared as follows: <br /> <br />0 Perform GPS Survey in accordance with Caltrans' GPS Survey Policy, dated February <br />1998 based on 1983 and 1988 datum. <br /> <br />0 Set photo-crosses, paint and perform level runs and GPS Survey ties. <br /> <br />0 Prepare and submit hardcopy survey of the proposed or existing control lines and <br />monumentation. <br /> <br />0 Prepare digital mapping in accordance with Caltrans requirements. Digital mapping <br />shall be submitted in both AutoCad and MicroStation formats. Digital mapping <br />submittal shall include aerotirangulation report, control point printouts, diapositives, <br />aerial. panel and analytical point values, air photo index maps, and photo mylar of <br />mapping. <br /> <br />0 Perform field surveys necessary for design, specifically along the city streets, for <br />conforms, and along Route 101 at the edge of pavement, roadway crown, temporary <br />conforms for stage construction, locations of culverts, storm drainage facilities, utility <br />covers, and inverts. Surveys shall consist of roadway cross-sections at 12 meter <br />intervals, extending 5 meters beyond the anticipated right-of-way lines. <br /> <br />0 Design for conforms shall be based on field surveyed cross-section data. Contour <br />grading and roadway quantities shall be supplemented by calculation of the digital <br />terrain model. <br /> <br />0 Supplement topography with the location of existing fences, poles, signs, street lights, <br />and trees. Trees shall be located by size and type, with drip line included. <br /> <br />0 Field-locate visible utility facilities such as manholes, utility poles and bases, guy <br />anchors, vaults, fire hydrants, and valve boxes. <br /> <br />0 Survey points and lines shall be established, marked, identified, referenced, and <br />documented as required, to complete the PS&E in accordance with the Caltrans Survey <br />Manual. <br /> <br />0 A copy of all original survey documents resulting from this contract, including original <br />field data, adjustment calculations, final results, and appropriate intermediate <br />documents shall be delivered to City/Caltrans. <br /> <br />0 Prepare survey staking control plan. <br /> <br />Survey notes and plots, closures and survey control plan <br />Digital mapping submittals <br /> <br />3.3 Compile Base Plans of Existing Facilities. Base mapping shall consist of digital plans of <br />field-surveyed information, plus right-of-way, control, and property ownership information. <br /> <br />Deliverables: <br /> <br />Exhibit "A" <br />Route JOJ/Ralston-Marine Parkway Interchange Project <br />Scope of Services <br /> <br />Page 4 <br /> <br />, ..','...,,'.. '--""'-'~--'-'----'-'---'----"--'-'-"'"' <br />