<br />Caltrans of the sampling program before drilling. Encroachment penn its will be required <br />from Caltrans. Notification to the City Project Manager will be at least one week prior to <br />work, and notification to Caltrans will be as specified in the respective encroachment <br />pennit The geotechnical sub consultant will arrange for traffic control, as required, for <br />field operations. <br /> <br />Materials/Geotechnical Design Report. Prepare Material/Geotechnical Design Reports in <br />accordance with Caltrans Memo GDR dated October 2, 1995. A Draft Report with log of <br />test borings will be submitted as a draft to Caltrans, comments incorporated, and 10 copies <br />issued of the final Materials/Geotechnical Design Report. Following is the detailed work <br />plan for the Geotechnical/Geotechnical Design Report: <br /> <br />0 PennitslResearch. Obtain the necessary encroachment pennits from Caltrans and the <br />County for field exploration work. <br /> <br />0 Review of readily available geologic and soil literature in the vicinity of the site, <br />including any boring infonnation. Also review previous Materials Reports on the <br />Route 580 Corridor. <br /> <br />0 Field Exploration. 22 shallow borings are proposed for the Materials Report for <br />roadway and retaining wall construction. The boring locations will depend on <br />available access, and any boring data from previous studies. <br /> <br />0 Obtain relatively undisturbed and bulk samples of substrata from test borings. <br /> <br />0 Laboratory Testing. Perfonn laboratory testing on representative samples including <br />moisture density, gradation analysis, consolidation, corrosion tests, and R-value. <br /> <br />0 Soil AnalysisÆvaluation. Perfonn engineering analysis and develop design <br />recommendations, including analysis for stability of slopes, pavement <br />recommendations, and corrosion study. <br /> <br />0 Draft Report. Prepare a draft Geotechnical Design Report following the guidelines in <br />Caltrans Memo Dated October 2, 1995, with log of test borings, in accordance with <br />California Test Method 130. <br /> <br />0 Final Report. Prepare the Final Report to address review comments. <br /> <br />Bridge Foundation Report. A Bridge Foundation Report will be prepared in accordance <br />with Caltrans DOS Foundation Report Requirements, and Memo to Designers. <br /> <br />This report will recommend structure foundation types and footing elevations. It will also <br />specify pile tip elevations for pile foundation, and will provide infonnation on groundwater <br />conditions, allowable bearing capacities, seismic data, and other infonnation needed to <br />evaluate the chosen foundation. This report will also address anticipated fill settlement <br />and recommended durations for settlement periods, to prevent excessive differential <br />settlement between the structure and adjacent roadway approaches. <br /> <br />Subsurface investigations shall confonn to the requirements in Section 4.3.5 of the Bridge <br />Design Specifications, and pile foundations shall provide for the utilization of Standard <br />piles as a minimum. A Log of Test Borings will be prepared and included as part of the <br /> <br />Exhibit "A" <br />Route ]OJ/Ralston-Marine Parkway Interchange Project <br />Scope of Services <br /> <br />Page 6 <br /> <br />. '...."...." -,."".. .-..,--..---, <br />