My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt99 City of Belmont
RedwoodCity
>
City Clerk
>
Agreements
>
1990-1999
>
1999
>
Agmt99 City of Belmont
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 2:32:52 PM
Creation date
4/19/2005 11:50:18 AM
Metadata
Fields
Template:
Agreement
Contractor Name
City of Belmont
PROJECT NAME
cost sharing agreement
RMP File Number
304
Date
4/6/1999
Reso Ref
13581
Box
5901
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Report and as part of the structure plans. <br /> <br />0 PermitslResearch. Obtain the necessary encroachment permits from Caltrans and the <br />County, for field exploration work. <br /> <br />D Review readily available geologic and soil literature in the vicinity of each site, <br />including any boring information. <br /> <br />D Field Exploration. 2 borings up to 70 feet in depth. <br /> <br />D Laboratory Testing. Perform laboratory testing on representative samples including <br />moisture density, plasticity index, gradation analysis, and laboratory compaction tests. <br /> <br />CJ Soil AnalysisÆvaluation. Perform engineering analysis, and develop design <br />recommendations, for the support of vertical and lateral loads for the proposed <br />structure. <br /> <br />D Preliminary Soils Recommendations. <br />foundation type. <br /> <br />D Prepare a Draft Foundation Report. Prepare a detailed report including design <br />recommendations for the foundation types and footing elevations. Also specified in the <br />report will be the tip elevations for the pile foundations, information on groundwater <br />conditions, allowable bearing capacity, anticipated fill settlement, and other <br />information needed to evaluate the selected foundation. <br /> <br />Prepare a preliminary recommendation for <br /> <br />D Final Foundation Report. Prepare the final Foundation Report, per PDT comments on <br />draft report. <br /> <br />Deliverables: 7 copies each of Draft Materials Report and Foundation Report <br />10 copies each of Final Materials Report and Foundation Report <br /> <br />3.8 Drainage Report. The Drainage Report shall include the following elements: review of <br />existing drainage culverts and ditches, recommendation for additional drainage facilities, <br />and maintaining historic drainage courses. Upgrading of culvert capacity, if required, will <br />be discussed. Drainage inlets will be analyzed for capacity and design spread of water <br />along curb faces. Detailed drainage tributary areas will be mapped form project <br />topographic mapping; the drainage system will be analyzed, using HYDRAIN, to obtain <br />design flows for culverts and ditches. <br /> <br />Deliverables: 5 copies each of Draft Drainage Report <br />10 copies each of Final Drainage Report <br /> <br />3.9 Geometric Approval Drawings. Prepare CADD generated 1: 1 000 and 1: 500 scale <br />geometric approval drawings. This work will include geometric refinements and the <br />preparation of GAD in accordance with Caltrans Standards. The draft GAD will be in a <br />form acceptable for inclusion into the Project Report. The Final GAD will include existing <br />topographic/planimetric mapping, calculated right-of-way lines and centerlines, <br />mathematized geometric layouts, traffic AMlPM peak hour volumes from the Project <br />Study Report, profiles, design criteria, and typical sections. <br /> <br />Exhibit "A" <br />Route JOJ/Ralston-Marine Parkway Interchange Project <br />Scope of Services <br /> <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.